Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Defence
  • /
  • Babcock marks key milestone as HMS Ocean undocks

Defence

Babcock marks key milestone as HMS Ocean undocks

An important milestone was reached this week in the major upkeep and upgrade programme being carried out by Babcock on HMS Ocean when the amphibious assault ship (the Royal Navy's largest ship) came out of dock at Babcock's Devonport Royal Dockyard.

The milestone, achieved on-schedule after seven months in dock, comes about half way through HMS Ocean’s substantial 15 month upgrade and overhaul programme, which includes more than 60 upgrades, mechanical improvements and an extensive maintenance package.  This massive upkeep period is around three times that of a typical Type 23 docking period in terms of volume of work, employing an average of 300 Babcock employees plus staff from over 70 contractor companies. 

Advertisement
Advanced Engineering RT

The undocking marks the completion of the dock-dependent elements, including overhaul of all the ship’s underwater valves, application of the outer bottom foul release paint coating, survey and represervation of tanks, repair of several sea tubes, and maintenance on the ship’s main propulsion system, propellors, shafts, rudders and stabilisers, as well as the overhaul and test of the ship’s mooring capstans, among other work. 

Work on HMS Ocean will now continue with the ship alongside.  This will include habitability improvements to the crew’s and embarked military forces’ living quarters and refurbishment of the main galley, laundry and commissariat, enhancement of the ship’s fire detection system, and commissioning the main propulsion and auxiliary systems, as well as work on aircraft lifts and weapons equipment.  Ship’s staff will move on board in early November, and HMS Ocean is expected to leave Devonport for sea trials in early 2014. 

This upkeep is the first on an amphibious ship under the full implementation of the Surface Ship Support Alliance (SSSA) Class Output Management (COM) approach, under which Babcock leads the support of all amphibious vessels.  Various approaches and measures are being applied by the COM team to optimise delivery, and achieve significant savings and efficiencies in the planning and execution of this major upkeep. 

Babcock Warship support managing director Mike Whalley commented: “This is a highly complex and challenging project both technically and in terms of project management, and we are delighted to have met this significant undocking milestone on schedule, thanks to hard work by all parties.  There is still considerable work to be done, and the team will now focus on continuing to maintain this strong progress through the rest of the project, to deliver HMS Ocean safely, on-time, fully refurbished with improved capability and performance, at optimum value for money.” 

Advertisement
ODU RT 2

Kevin Barry, the DE&S Destroyers and Amphibious Platforms team leader said: “I am particularly encouraged by the strong team ethos which has been vital to overcoming some significant challenges in getting to this project milestone.  The fact that MoD, industry and RN teams are utilising the huge range of skills and experience they possess and working so effectively together is fundamental to delivery of such large and complex projects.  We are now focused on successful delivery of this hugely capable and versatile platform back to the Fleet.”

 Courtesy Royal Navy

 

Advertisement
General Atomics LB General Atomics LB
PPM Systems enables 5x increase in detection range

Defence Security Events

PPM Systems enables 5x increase in detection range

25 April 2024

Swindon based PPM Systems are increasing observational antenna radius by solving signal distribution limitations.

DE&S advances to next gen fires platform

Defence

DE&S advances to next gen fires platform

25 April 2024

A significant milestone in the modernisation of the British Army’s artillery has been agreed following a landmark defence agreement between the United Kingdom and Germany.

British Army’s Challenger 3 conducts live firings

Defence Events

British Army’s Challenger 3 conducts live firings

25 April 2024

Live firings of the British Army’s highly lethal future tank – the Challenger 3 - have taken place in Germany this week, witnessed by UK Defence Procurement Minister, James Cartlidge.

QinetiQ achieves UK’s first aircraft and autonomous drone teaming

Defence

QinetiQ achieves UK’s first aircraft and autonomous drone teaming

25 April 2024

QinetiQ has successfully trialled the UK’s first Crewed-Uncrewed-Teaming demonstration between a crewed aircraft and an autonomous jet drone.

Advertisement
Marshall RT 2
Kromek receives US nuclear security contract

Defence Security

Kromek receives US nuclear security contract

25 April 2024

Kromek Group plc has been awarded a contract, worth up to $2.9 million, from a US federal entity for the provision of nuclear security products.

Babcock to manage Type 23 for Royal Navy

Defence

Babcock to manage Type 23 for Royal Navy

25 April 2024

Babcock International Group has been awarded the contract to manage the Type 23 class frigate Refit Support Group, allowing the company to take end-to-end responsibility for vessel upkeep and regeneration in preparation for handover to the ship’s crew.

Advertisement
ODU RT 2