in Space

GKN delivers advanced Ariane 6 Nozzle to Airbus Safran Launchers

Posted 20 June 2017 · Add Comment

GKN Aerospace has delivered the first advanced Ariane 6 nozzle (SWAN) to Airbus Safran Launchers in France for the Vulcain 2.1 engine.


 
Above:
The Ariane 6 Nozzle.
Courtesy GKN


The new state of the art nozzle, which measures 2.5m in diameter  incorporates innovative technologies with higher performance, lower lead times and substantial  cost reduction.

Large scale use of laser welding and laser metal deposition (additive manufacturing) for key structural features resulted in 90% reduction of component parts, taking it down from approximately 1000 parts to 100 parts.

A demonstrator nozzle has already been successfully trialled in a full scale engine nozzle test as part of the European Space Agency’s Ariane  Research and Technology Accompaniment (ARTA) Program. Now the flight configuration nozzle will be mounted in France to the Vulcain 2.1 engine for a test in Germany.

The Ariane 6 is scheduled to enter service in 2020. Airbus Safran Launchers is the prime contractor and GKN’s customer in this development programme funded by the European Space Agency (ESA).
 
GKN Aerospace will manufacture the nozzle in a new highly automated manufacturing center in its facility in Trollhättan, Sweden, which is scheduled to open in 2018.

In total GKN Aerospace will provide five complex sub-systems for each Ariane 6 rocket, including four turbine assemblies for the two engines, generating power for the hydrogen and oxygen fuel systems.
 
Sebastien Aknouche General Manager Space, GKN Aerospace Engine Systems said: “We are proud to be part of the Ariane 6 team. The advanced nozzle manufactured with breakthrough technologies is a true innovation. With the support of the Swedish National Space Board we participated in the initial engine demonstrator programs. This allowed us to work with our customer to prove the great added value that innovative technologies like additive manufacturing have for the design and production processes in the space and aerospace industry.”
 
GKN Aerospace’s space business unit, in Trollhättan, Sweden, has been active in the Ariane programme from its inception in 1974 and has made over 1,000 combustion chambers and nozzles as well as over 250 turbines for the Ariane rocket to date.

* required field

Post a comment

Other Stories
Advertisement
Latest News

Aircraft production soars towards annual record

November reached new heights for aircraft deliveries, as both the highest month of this year so far and the best November on record.

Iain Harrison awarded CBE in Queen’s New Year’s Honours List

Iain Harrison, Strategic Engagement Director at QinetiQ since September 2017, has been awarded a CBE in the New Year’s Honours List 2018 for his contribution to the British Army.

INVISIO awarded DALO contract

INVISIO has signed a framework agreement with the Danish Defence Acquisition and Logistics Organization (DALO), to supply communication systems to the Danish Army.

Treehouse yields positive results for BAE Systems

Gloucestershire based Innovation & Creative Training Company, Treehouse, has recently completed its first management development programme for BAE Systems’ Combat Air Product Support department, with the Managing

Supacat's SOV-MH fleet accepted in New Zealand

Supacat has announced that the fleet of Special Operations Vehicles – Mobility Heavy (SOV-MH) has been accepted by the New Zealand Ministry of Defence and goes into service with the New Zealand Defence Force early this year.

FDM invests in HP MJF 3D printer

UK additive manufacturing company, FDM Digital Solutions, has invested in a cutting-edge HP additive manufacturing machine which will revolutionise the way end use components are manufactured, saving time, money and resources.

SMI NCWSK0801210118
See us at
FIL18 BT111017220718SMI FAVSABT2411120418SMI NCWBT3110020218S&P BT281117080318Aviation Africa BT18418