Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Defence
  • /
  • Sites for submarine dismantling consultations confirmed

Defence

Sites for submarine dismantling consultations confirmed

Five UK nuclear facilities have been confirmed as potential sites to store waste from decommissioned nuclear-powered submarines.

Above: HMS Trafalgar.
Darren MacDonald, Crown copyright

A public consultation process will run from 14 November 2014 until 20 February 2015 to help determine which site is selected.

The sites, which already hold radioactive materials, are either owned by MoD, the Nuclear Decommissioning Authority (NDA) or industry. They are:

Advertisement
ODU RT
  • the Atomic Weapons Establishment (AWE) sites at Aldermaston and Burghfield in Berkshire which are owned by MOD and run by AWE plc
  • Sellafield in west Cumbria, owned by the NDA
  • Chapelcross in Dumfriesshire, owned by the NDA
  • Capenhurst in Cheshire, which is run by Capenhurst Nuclear Services

 

Minister for Defence Equipment, Support and Technology, Philip Dunne, said: "When the submarines in the Royal Navy fleet reach the end of their lives we need to dispose of them in a way that is safe, secure and environmentally sound.

"This open and transparent public consultation process provides the opportunity to work closely with local communities near to potential sites to listen carefully to their views with the aim of delivering a solution that achieves these objectives.

"We value the views of those who have something to say about the submarine dismantling project. All of them will be considered properly as part of our decision-making process.

Advertisement
ODU RT

"After consultation we will publish a report on our findings and after we have selected a site, we will explain why we reached that decision."

The submarine dismantling project will oversee the disposal of 27 Royal Navy nuclear submarines that are due to have left Naval service by the mid 2030’s and be defuelled, including 19 submarines that have already left service and are stored afloat at Rosyth and Devonport.

The submarines can only be completely dismantled once reactor components, which are categorised as radioactive waste, have been removed. The initial dismantling process will support up to 60 skilled jobs.

There will be a series of exhibitions and workshops close to all five sites - which were previously announced on a provisional shortlist on 13 February 2014, plus two national workshops.

The site chosen will be used for interim storage of reactor components until after 2040, when the UK Geological Disposal Facility is planned to come into operation.

 

Advertisement
L3Harris L3Harris
NP Aerospace extends Ukraine support with Norway contract

Defence

NP Aerospace extends Ukraine support with Norway contract

24 April 2024

NP Aerospace is continuing its support for Ukraine with the delivery of a further 2,000 sets of body armour and carrier vests via Norway and the UK Ministry of Defence.

PA Consulting launches Secure Futures report

Defence Security Space

PA Consulting launches Secure Futures report

24 April 2024

PA Consulting has announced the launch of its Secure Futures report, part of its Secure Futures series providing insights and events emphasising the importance of collaboration in delivering a secure future.

DASA seeks novel testing and evaluation for defence

Defence

DASA seeks novel testing and evaluation for defence

24 April 2024

The Defence and Security Accelerator (DASA) has launched a new Innovation Focus Area (IFA) called Unlocking the True Potential of Test and Evaluation for Defence, run on behalf of the Ministry of Defence (MoD).

UK set to increase defence spending to 2.5% by 2030

Defence

UK set to increase defence spending to 2.5% by 2030

24 April 2024

Prime Minister Rishi Sunak has announced that the UK will increase defence spending to 2.5% by 2030.

Advertisement
Marshall RT 2
BMT partners with DNV to advance Australian Landing Craft design

Defence

BMT partners with DNV to advance Australian Landing Craft design

24 April 2024

BMT has signed a Memorandum of Understanding (MoU) with classification society DNV, primarily aimed at advancing BMT’s development of an Australian version of its CAIMEN Large Design for the future Landing Craft – Heavy (LC-H) programme, for the Australian Army.

BMT SPARO project secures British Army funding

Defence

BMT SPARO project secures British Army funding

23 April 2024

In a major development for the BMT SPARO project, the British Army’s Futures Directorate has provided funding to build, supply and demonstrate the latest prototype for UK medics who took part in Project CONVERGENCE, the premier US Army experimentation exercise in March.

Advertisement
Marshall RT