Bringing command and control to the defence programme office
Chris Morton is Vice President of Industries at IFS, specialising in aerospace and defence. A former military attack helicopter pilot and US Department of Defense strategic analyst, he draws on his military and consulting experience to help organisations build, operate and maintain complex assets. He is also a commercial pilot.
Every operations centre I worked in, whether that was an operations centre in Afghanistan or the Joint Staff, was built around one screen: the common operating picture. Friendly positions, threat activity, logistics status, weather – all presented with one end in mind: decision advantage. If done right, it was trusted in the room for critical decision-making.
Commanders didn’t want to worry about whether the number was right – they wanted to argue about what to do next.
In contrast, walk into most defence manufacturers today, and you’ll find the opposite. Engineering has its view of the programme. Procurement another. Finance closes the books and figures out how good the margins were three weeks ago. The programme manager sits in the middle – doing their level best to stitch it all together on Thursday for their Friday programme review board. After the weekend, it’s all gone stale, and the cycle begins again.
For defence manufacturing, it’s what you can’t see that eats your margin.
Record defence demand, growing pressure on margins
Let’s look at the industry backdrop defence manufacturers currently operate in:
- Backlogs are at historic highs. Holding on to the profit inside them is getting harder, and the pressure is coming from all directions at once – programme managers are surrounded.
- Contract structure. Defence work runs on a mix of fixed-price and cost-type contracts, and each has its own trap. On fixed-price work, every overrun comes straight out of your margin. For cost-type work, indirect costs (overheads, G&A, fringe) must be allocated, justified and defended under government accounting rules. Get the rates wrong and you either leave money on the table or hand an auditor a finding.
- Material volatility. 78% of Department of War weapons programmes contain components that depend on inputs such as rare earth materials, with the US importing more than 95% of its rare earth elements. On a multi-year programme, the price you bid in year one becomes incredible friction in year three.
- Oversight. In the US, DFARS, DCAA and DCMA each bring their own requirements. The UK has its single-source contract regulations, and allies across Europe and Asia-Pacific run their own regimes. Every one of them gets expensive when your data lives in five places.
Where margins leak
Disconnected systems rarely cause just one dramatic failure. The damage is quieter and cumulative:
- Buying the same part three times in small lots because nobody could see combined demand across multiple programmes.
- Labour charged to the wrong contract or cost pool, hidden until the audit.
- Finance teams burning weeks on custom reports for the government, the prime and internal leadership teams, each built on a different report from different spreadsheets.
- A schedule slips because nobody flags the issue until the milestone has arrived or passed.
None of these shows up as a cost line item – they show up as margin leakage on contracts that looked healthy at bid and ultimately close at half of what was expected.

Indeed, public records show how hard tracking has become in the modern ecosystem. Only two of the UK’s 49 major defence projects are currently on schedule. Not every delay traces back to systems, but a programme you can’t see is a programme you can’t steer, and every added tier of subcontractor and funding line makes tracking even more difficult.
The usual pushback: ‘Our ERP already does project accounting.’ Most do, after the fact – but they are nothing more than a history lesson. The real test is whether a system tells you something while there is still time to act on it.
Put the contract at the centre
I would submit that the fix is architectural. Make the contract the demand vehicle for the entire system, the hub every other function hangs off.
With the contract at the centre, a change in one place triggers action everywhere else. A scope modification flows to engineering, replans procurement, updates the labour forecast and rolls straight up into project margin. Programme status becomes something you look at rather than a meeting you schedule.
In practice, a robust project-based ERP built for defence should do four things really well:
- Trace every transaction to the contract. Purchase orders, materials, labour and overheads, captured at the line level as they happen.
- Forecast margin on actuals. Real prices and real hours, so the estimate at completion reflects today rather than the original bid.
- Produce compliance as a by-product. DCAA-ready cost reporting, incurred cost submissions, DD250 receiving reports and electronic invoicing, generated from the same data the programme team runs on.
- Give every stakeholder their own view of one truth. The programme manager, the CFO, the contracting officer and the prime all see the same numbers – cut the way each of them needs.
I’d be remiss if I didn’t mention the opportunity that AI is bringing to the table. I’ve long argued that AI is really good for things that are dull, data-intensive and disconnected. If that doesn’t read like a list of a programme manager’s daily life, I don’t know what does.
Contracting for defence success
For defence manufacturers, effective project management must serve as the epicentre of business operations and organisational information flow. Having an underlying robust project management system will enable defence manufacturers to navigate the complex requirements of defence contracts and give project managers complete visibility to drive defence project and contract success.
This seems obvious, but frankly, it sits in the background, and focusing on ‘back office’ systems is rarely seen by organisations as a way to bring value to their companies.

Defence manufacturers make money first by winning government contracts. The second is maintaining margins on those contracts. The first makes the headlines. The second doesn’t show up until well after the champagne has run dry.
The military has learned this lesson the hard way. Build the common operating picture first, and decisions get faster and better because nobody is busy debating the facts. Backlogs, volatile supply chains and heavier oversight are not black swan events or ‘disruption’. They are the norm. Programmes you can’t see command you. Instead, programme managers need a system that they can command.