Scaling up defence production: Why property must be part of the plan

Winning a defence contract can expose weaknesses in a company's property strategy. Newsteer explores how early planning can support sustainable growth.

Newsteer's David Felman headshot on defence property

David Felman, Director, Occupier Advisory at real estate consultancy Newsteer, explains how the contract you win tomorrow could expose the property decision you make today and why it’s essential that defence sector firms futureproof their real estate strategies.

For an early-stage or fast-growing defence company, property can understandably sit quite a long way down the priority list. Technology comes first, then people, funding, customers and contracts. Property gets dealt with when more space is needed, and that approach works – until it doesn’t.

From prototype to production

The particular issue we’re increasingly encountering is the transition from research and development into production. A company may occupy space perfectly suited to developing a prototype, but if the prototype is successful and a contract follows, its property requirement can change almost overnight.

And that is the very point at which a property decision made several years earlier can become a very expensive constraint. It was one of the main issues I raised in our recent defence discussion: businesses which initially need research and development space can find themselves having to convert that property for production, including satisfying quite different operational and security requirements.

There’s a tendency to treat real estate as something that follows the business plan, but property is part of operational planning. For rapid-growth defence companies, it needs to form part of the business plan.

Planning property around future defence contracts

The question when taking a building should therefore not simply be ‘Does this work for us now?’ but also ‘What happens here if we win the contract?’

That means considering whether the building can accommodate additional power, a different type of operation, enhanced security requirements and a growing workforce. It also means asking whether there is room to expand on the existing site or nearby, and whether the lease provides enough flexibility to make those changes.

Those are far easier questions to answer before committing to property than afterwards. We have seen what early planning can achieve; our own experience illustrates the commercial difference. On one defence-sector requirement in London, Newsteer advised on the acquisition of a 40,000 sq ft pre-let research and development facility alongside the regearing of a 120,000 sq ft existing facility.

Above: Aerial view of Saxon Air hangar. Photo: copyright Saxon Air
Photo: Saxon Air

The property strategy reduced projected capital outlay from a potential £32 million to approximately £10 million. A pre-let solution, landlord incentives and contributions were secured, while lease extensions at the existing facility enabled an 18-month delivery programme without interrupting production.

That’s not simply a property saving; it’s operational resilience.

On another requirement in the South East, a 20,000 sq ft facility was secured for a naval systems supplier requiring additional capacity. The strategy included an off-market acquisition, planning for specification and power upgrades, and phased occupation. The recorded outcome was a 10% saving against forecast costs while maintaining operations.

The lesson from both is fairly simple: deal with these issues early enough and property becomes an enabler rather than a blocker.

Keeping pace with defence procurement

Speed is becoming more important, too, and government policy is reinforcing this. The Strategic Defence Review explicitly talks about innovation and procurement being measured in months rather than years.

That philosophy cannot stop at procurement. If defence technology needs to move rapidly from development into deployment, the supporting property has to be capable of moving at a similar pace.

Portrait of Professional Heavy Industry Engineer.
Photo: Getac

For companies in the defence supply chain, futureproofing therefore doesn’t mean predicting exactly what your business will look like five years from now – nobody can do that – but it does mean creating enough optionality that success doesn’t leave you trapped by yesterday’s property decision.

If your business is moving from development towards production, now is the time to test whether your property strategy can support that transition.

Related

Poseidon, Rivet Joint, and Wedgetail: The RAF’s surveillance aircraft fleet explained
RAFP-8
Poseidon, Rivet Joint, and Wedgetail: The RAF’s surveillance aircraft fleet explained
Each aircraft has a distinct role, ranging from hunting submarines to monitoring electronic signals and directing combat aircraft.
Aerospace

29 Nov 2026

ACMI bankruptcies force Air Zimbabwe and Pakistan International to find alternatives for UK flights
Norse Atlantic Airways Boeing 787 landing during sunset
ACMI bankruptcies force Air Zimbabwe and Pakistan International to find alternatives for UK flights
Air Zimbabwe secured a EuroAtlantic A330 while PIA redistributed capacity to free up Boeing 777s to keep its UK routes running.
Aerospace

28 Nov 2026

Trizo opens new electronics facility
Trizo facility
Trizo opens new electronics facility
Trizo's new electronics facility doubles the company's surface mount technology (SMT) capacity and provides enhanced space for box build, inspection and testing operations for the aerospace, defence and space sectors.
Bringing command and control to the defence programme office
Chris Morton, Global Industry Director for Aerospace and Defense, IFS
Bringing command and control to the defence programme office
The three largest US defence contractors are carrying a combined backlog of $557 billion. As demand climbs, cost, margin and audit exposure sit in the crosshairs of every programme. For Chris Morton, Vice President of Industries at IFS, visibility is the ultimate control mechanism, and siloed systems are quietly taking it away. With record backlogs, volatile materials and relentless oversight squeezing defence margins, the fix starts with a common operating picture, as he explains here.
Defence Insights

28 Nov 2026

Beyond procurement: Unlocking R&D tax relief in the UK defence supply chain
Peter Beavis Forrest Brown
Beyond procurement: Unlocking R&D tax relief in the UK defence supply chain
As UK defence investment accelerates, ForrestBrown's Peter Beavis explores how businesses across the supply chain can identify qualifying R&D activity and navigate the complexities of tax relief.
Defence Insights

28 Nov 2026

Trizo opens new electronics facility
Trizo facility
Trizo opens new electronics facility
Trizo's new electronics facility doubles the company's surface mount technology (SMT) capacity and provides enhanced space for box build, inspection and testing operations for the aerospace, defence and space sectors.
The rise and fall of HOTOL: Britain’s spaceplane that aimed to transform spaceflight
HOTOL
The rise and fall of HOTOL: Britain’s spaceplane that aimed to transform spaceflight
Despite its revolutionary technology and considerable ambition, it never progressed beyond the design and feasibility stages.
Space

28 Nov 2026

Astronomer awarded Royal Society fellowship to study Galaxy’s ancient stars
Dr Anke Ardern-Arentsen
Astronomer awarded Royal Society fellowship to study Galaxy’s ancient stars
Some of the oldest stars in the Milky Way, which formed while our Galaxy was still taking shape, are the focus of an eight-year Royal Society fellowship, in a study being undertaken by Dr Anke Ardern-Arentsen at the University of Surrey.
Space

28 Nov 2026

UK sets out licensing guidance for satellite servicing and debris removal missions
3D illustration of Space debris and satellites in orbit planet Earth. High quality digital space art in 5K - ultra realistic visualization.
UK sets out licensing guidance for satellite servicing and debris removal missions
The UK CAA has published new CAP 3295 guidance introducing flexible "mission envelope" licensing and waiving orbital liability insurance requirements until 2030 for satellite servicing and space debris removal.
Space Uncategorized

27 Nov 2026

UK to launch strategy to attract private investment into defence
British Commandos from 148 Battery conduct an amphibious beach landing on Cape Wrath during SW26. Image: MOD Crown Copyright/LPhot Hutchins
UK to launch strategy to attract private investment into defence
The Government will unveil its Defence Finance and Investment Strategy on 1 December, setting out plans to attract private capital, strengthen supply chains and expand industrial capacity. 
Defence Security

27 Nov 2026

Who are the UK’s Strategic Reservists and which veterans can be called up?
British Army exercise in Wales
Who are the UK’s Strategic Reservists and which veterans can be called up?
The UK Ministry of Defence has contacted around 100,000 former Armed Forces personnel in the Strategic Reserve. But what is the Strategic Reserve, who remains legally liable for recall after leaving military service, and how could the Armed Forces Bill 2026 change the rules?
Defence Security

27 Nov 2026

RAF reportedly moving aircraft into hangars amid drone threat concerns
RAF Typhoon parked in a hangar
RAF reportedly moving aircraft into hangars amid drone threat concerns
The Ministry of Defence has told Advance that it is adapting security measures to counter potential threats, as UK defence companies face a heightened risk of Russian sabotage.
Defence Security

25 Nov 2026