Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide

Aerospace

Airbus C295 FTB2 makes maiden flight

The Airbus C295 Flight Test Bed 2 (FTB2) technology demonstrator of Clean Sky 2, has successfully performed its maiden flight from the Final Assembly Line in Seville.



Image copyright Airbus / Photographer Maria Molina

The aircraft now starts a flight campaign with the aim of testing the new semi-morphing wing, the new affordable flight control system, as well as a SatCom antenna embedded within the aircraft’s fuselage.

“The first flight of the C295 FTB2 is a key milestone that represents an important step forward in the programme, following the successful integration of the new aero structures, power-on and ground tests. A few years ago this programme was just a dream of a more sustainable future for aviation. Today we are at the final stage and we finally made it fly” said Francisco Javier Sánchez Segura, Executive Vice President Engineering Airbus Defence and Space.

Advertisement
ODU RT

Based on the Airbus C295, the Flight Test Bed 2 is an in-flight demonstrator of the European Clean Sky 2 (CS2) and the EU Horizon 2020 research and innovation programme, where technologies related to CS2’s future regional multimission aircraft are tested.

The modifications include new materials and technologies designed to achieve noise, CO2 and NOx emissions reduction. With these technologies applied in a future regional multimission configuration, up to 43% CO2 and 70% NOx reductions can be achieved in a typical Search and Rescue mission of 400 nautical miles, as well as 45% less noise during take-off.

The main modifications in the aircraft are a new high-efficiency semi-morphing wing, new dynamic winglets and a flat panel SATCOM antenna integrated within the top of the fuselage.  In addition, innovative flight controls for primary control surfaces, including ailerons, flaps and flap tabs with improved aerodynamics, are capable of adjusting in-flight and contribute to a more efficient high lift system.

The new flight control system leverages digital control systems to optimise the aerodynamic shape of the wing in flight, while a new multifunctional flap has been completely redesigned and includes flap tabs in the trailing edge controlled by electro-mechanical actuators.

Advertisement
Leonardo animated rectangle

But the advantages also extend into the manufacturing process, not least with the use of advanced materials and manufacturing ranging from the use of Scalmalloy and additive manufacturing, to a new assembly method for the aero structures of the wing.  A one shot assembly approach has been used for the new composite winglet and winglet tab, moving from the conventional ribs approach to a multi-spar integrated torsion box. Finally, jig-less methods have been used for the assembly of flaps and ailerons.

As a result, the C295 FTB2 brings improvements not only to the purely operational aspects of the aircraft, but helps introduce new improvement to the design and manufacturing process.
 

 

Advertisement
General Atomics LB
Altus to showcase advanced solutions at Southern Manufacturing & Electronics 2026

Aerospace Defence Events

Altus to showcase advanced solutions at Southern Manufacturing & Electronics 2026

16 December 2025

Distributor of advanced electronics manufacturing equipment in the UK and Ireland, Altus Group, will return to Southern Manufacturing & Electronics from 3rd-5th February 2026 at the Farnborough International Exhibition Centre, to showcase a range of advanced process technologies from global suppliers.

Wallwork returning to Southern Manufacturing 2026

Aerospace Defence Events

Wallwork returning to Southern Manufacturing 2026

15 December 2025

Wallwork Group will be returning to Southern Manufacturing 2026 - being held 3rd–5th February 2026 at the Farnborough International Exhibition Centre - with a significantly expanded capability, showcasing the hard coatings, heat treatments and advanced thermal processing solutions they supply.

Spaceport Cornwall and National Drone Hub launch UAS project

Aerospace Defence Security Space

Spaceport Cornwall and National Drone Hub launch UAS project

15 December 2025

The UK's first licensed spaceport, Spaceport Cornwall, has commenced work on a groundbreaking project with the National Drone Hub to establish a unique testing environment for uncrewed aerial systems (UAS).

Smiths Detection’s SDX 100100 DV HC on TSA ACSTL

Aerospace Security

Smiths Detection’s SDX 100100 DV HC on TSA ACSTL

15 December 2025

Smiths Detection's SDX 100100 DV HC X-ray scanner has been added to the Transportation Security Administration’s Air Cargo Screening Technology List (ACSTL), enabling its use by regulated operators across the US air cargo sector.

Advertisement
ODU RT
UK Government invests in next generation of aviators

Aerospace

UK Government invests in next generation of aviators

12 December 2025

Projects to inspire the next generation of aviators across the UK are set to get a boost as the Government today announced a £750,000 boost to projects inspiring young people to explore careers in aviation.

ITA Airways adopts Iris tech

Aerospace Space

ITA Airways adopts Iris tech

11 December 2025

Viasat has announced that ITA Airways is being equipped with Iris technology, paving the way to trajectory-based operations which can cut emissions and enhance airline efficiency.

Advertisement
Leonardo animated rectangle