Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Defence
  • /
  • Babcock awarded 10-year dry-dock contract for HMS QEC aircraft carriers

Defence

Babcock awarded 10-year dry-dock contract for HMS QEC aircraft carriers

Babcock has been awarded a 10-year contract to provide dry-dock maintenance for the Royal Navy’s Queen Elizabeth class (QEC) aircraft carriers.

Image courtesy Babcock

The new £30 million contract follows a previous maintenance period where Babcock completed the first docking for HMS Queen Elizabeth at the Rosyth site in 2019 and includes all routine maintenance and repairs that cannot be done when the vessel is afloat. In addition to the scheduled dockings, Babcock will provide facilities for any contingency dockings required over the 10-year contract duration while sustaining and supporting around 300 jobs.

Advertisement
Amentum rectangle

The first planned activity will take place next year with a six-week work package.

This is a significant milestone for big ship dockings at Rosyth, which was the integration site for the UK carrier build and assembly programme from 2008 to 2019. Babcock has invested more than £100 million in skills, digitisation and site infrastructure over recent years at Rosyth. This is now one of the UK’s most modern, capable and competitive manufacturing and repair facilities for large scale marine and energy programmes, with a circa 2,000-strong workforce.

Alongside traditional maintenance practices, the ships’ docking period will further benefit from the digital transformation underway at the Rosyth site, which is already in place to support the build and assembly of the Royal Navy’s new Type 31 Inspiration Class frigates.

Defence Procurement Minister Jeremy Quin said: "The Queen Elizabeth Class Carriers are the flagships of our Royal Navy and it’s crucial they remain ready to protect and defend the UK and our allies.

"Both carriers had their final construction in Rosyth, and I’m pleased they will return for their dry-dock maintenance, supporting vital jobs and skills in Scotland."

QECs require dry-docking periodically throughout their lives to undertake maintenance and repair activities that will ensure the UK continues to have a flexible and modern naval force that can respond to future threats.

The QECs continue to uphold security both in UK waters and overseas. HMS Prince of Wales recently supported Exercise Cold Response with her sister ship HMS Queen Elizabeth carrying out vital training and exercises in waters close to the UK to keep her ready for operations anywhere in the world.

Advertisement
Leonardo

Steve Coates, DE&S Queen Elizabeth Class Group Leader, said: "Securing this contract is another important step on the QEC journey. The agreed partnership is a real testament to the great working relationship forged between the MOD and industry. The work that will take place will help to sustain vital jobs and skills at the Rosyth shipyard where the carriers were built and, by drawing on an extensive supply chain, will contribute to wider UK prosperity.

The contract was awarded by Defence Equipment & Support (DE&S) through a robust and transparent competition, encouraging strong bids from viable dockyards with the requisite facilities and experience of docking large vessels, whether military or civilian.

Sean Donaldson, Babcock’s Managing Director of Marine Engineering and Systems and the Rosyth site, said: “We are delighted to have been awarded the contract to provide dry dockings for the aircraft carriers over the next decade. The investments in our Rosyth infrastructure and facilities over the last 10-years mean we are ideally placed to deliver projects of this size and scale. The programme will also benefit from the extensive knowledge and expertise of Babcock’s skilled workforce which is steeped in carrier experience. It’s a really proud moment for us.”

With an expected service life of up to 50 years, the aircraft carriers are highly versatile and potent joint defence assets, able to meet the widest range of tasks around the world. They are the most capable and powerful surface warships ever constructed in the UK.

As a key partner in the UK’s Aircraft Carrier Alliance, Babcock optimised countrywide facilities and a wealth of specialised knowledge and experience to deliver the detailed design and whole ship assembly for the QEC programme from her keel to mast, ensuring this remains one of Babcock’s flagship programmes.


 

Advertisement
General Atomics LB
Intelliconnect strengthens management team

Aerospace Defence

Intelliconnect strengthens management team

17 September 2025

RF and Cryogenic interconnect solutions specialist Intelliconnect (Europe), has strengthened its senior leadership team with the appointment of Yiannis Metallinos as Managing Director and Gary Langridge as Engineering Manager.

Teledyne FLIR Defense and AimLock collaborate on autonomous kinetic capabilities

Defence

Teledyne FLIR Defense and AimLock collaborate on autonomous kinetic capabilities

17 September 2025

AimLock is collaborating with Teledyne FLIR Defense to provide autonomous kinetic capabilities for the company’s SUGV 325 and Kobra 725 ground robots.

Captec expands surface treatment facility to meet BR 3939 standards

Defence

Captec expands surface treatment facility to meet BR 3939 standards

17 September 2025

Captec has made a major investment in its specialist surface treatment infrastructure, positioning it among a select few in the UK with the capability to meet the most stringent levels of the latest 2025 BR 3939 Warpaint standards.

Getac launches UX10 and UX10-IP rugged tablets

Aerospace Defence Security

Getac launches UX10 and UX10-IP rugged tablets

17 September 2025

Getac has announced the launch of its next generation UX10 and UX10-IP fully rugged tablets.

Advertisement
Leonardo
BAE Systems and PGZ partner to boost munitions production

Defence

BAE Systems and PGZ partner to boost munitions production

16 September 2025

Polska Grupa Zbrojeniowa (PGZ) and BAE Systems have entered into a strategic partnership to establish a new 155mm artillery ammunition manufacturing facility in Poland, aimed at increasing the nation’s production of battlefield ammunition.

Smith Myers to supply ARTEMIS Systems to Airbus Helicopters

Aerospace Defence

Smith Myers to supply ARTEMIS Systems to Airbus Helicopters

16 September 2025

Smith Myers has secured a major contract with Airbus Helicopters, under the framework of which ARTEMIS Mobile Phone Detection and Location Systems (MPDLS) will be factory-fitted and offered as a retrofit option across Airbus Helicopters' fleet of aircraft.

Advertisement
ODU RT