in Defence

BAE Systems awarded US Army ERCA prototype contract

Posted 16 July 2019 · Add Comment

The US Army has awarded BAE Systems a $45 million contract for the Extended Range Cannon Artillery (ERCA) Increment 1 prototype with the purpose of increasing the range and rate of fire on current and future M109A7 self-propelled howitzers.


   
Above: ERCA will be integrated into an M109A7 Self Propelled Howitzer.
Courtesy BAE Systems


The development of ERCA is in collaboration with the Army’s Combat Capabilities Development Command (CCDC) Armaments Center.
 
This prototype phase will address capability gaps in the Army’s indirect fire systems and improve the rate and range of fire with the development of power distribution software and hardware integration solutions. ERCA will be integrated onto the M109A7 and will require the M109A7’s current 39-caliber turret to be replaced with a 58-caliber, 30-foot long gun barrel with the objective of creating firepower double the current range.
 
“ERCA is a significant technological step forward for the Army’s artillery portfolio,” said Scott Davis, vice president of programmes, BAE Systems’ Combat Vehicles business. “We were selected based on our years of experience in the development of self-propelled howitzer systems. Long-range precision fire is a top priority for the Army, and we are pleased to be a partner in efforts to equip soldiers with the latest technology.”

The development programme aims to provide the warfighter with extended range while maintaining the weight found in current systems to minimise performance impacts on the chassis. Under separate contracts, BAE Systems is also developing precision guidance kits with anti-jamming capabilities (PGK-AJ) that can operate in the challenging ERCA firing environment. PGK-AJ is compatible with existing and new long-range rounds for multiple firing platforms, including the M109 self-propelled howitzer.

BAE Systems is currently producing the M109A7 configuration for the Army in the low-rate initial production phase.
 
Development work on ERCA Self Propelled Howitzer will take place at the Army’s Picatinny Arsenal and BAE Systems’ facilities in York, Pennsylvania; Sterling Heights, Michigan and Minneapolis, Minnesota.
 

* required field

Post a comment

Other Stories
Advertisement
Latest News

Virgin Galactic opens up interior of Gateway to Space

Virgin Galactic has revealed the first phase of the interior of Spaceport America in New Mexico, the world’s first-ever commercial spaceport.

Meggitt wins orders with Lockheed Martin and the Defense Logistics Agency

Meggitt plc has announced two deals with an aggregated value of $85 million with Lockheed Martin and the Defense Logistics Agency in the United States.

Advanced Engineering lines up speakers for open forum

The UK’s largest annual engineering show, Advanced Engineering, has announced some of the companies providing guest speakers that will be presenting at the show on 30th and 31st October 2019 at the NEC in Birmingham.

Police Scotland makes £3.9m tech investment

Police Scotland is investing £3.9m in a faster computer network to improve service and efficiency across the country.

Validair launches android app for VMS

Validair Monitoring Solutions Ltd (VMSL) announces the introduction of a brand new Android smartphone app for users of VMS systems incorporating the ViGIE software that offers comprehensive remote functionality as well as live

BA's A350 gears up for its first long haul flight to Dubai

British Airways’ first A350 aircraft is being put through its paces with extensive service trials ahead of it starting long-haul flying to Dubai on 2nd September.

ODU 0201311219
See us at
SMI GMS BT1906071119SMI ActiveP BT1206121119SMI FAV BT1006141119TMP BT0708090919DSEI JP BT1605201119VIDSE BT1605060320ADSS1000DBT1706171019FIL20BT010819260720