Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Aerospace
  • /
  • Bristol Airport invests £3.5m in Air Traffic Control Tower

Aerospace

Bristol Airport invests £3.5m in Air Traffic Control Tower

Bristol Airport has commenced work on a comprehensive six-month refurbishment of the Air Traffic Control Tower and is investing over £3.5 million to improve and enhance the 20-year-old facility.

Image courtesy Bristol Airport

The Tower will undergo extensive renovations, improving the overall aesthetics and functionality of the building whilst meeting the latest building standards and regulations. It will incorporate environmentally friendly elements such as energy-efficient lighting, heating and cooling system reducing the building’s carbon footprint.

Advertisement
ODU RT

The project will include several significant improvements to the Air Traffic Control Tower including:

  • Over £3.5 million investment
  • Lift replacement
  • New external facing
  • Enhanced insulation
  • New doors and windows
  • Enhanced rest facilities for colleagues
  • Roof works

The investment will provide a significantly improved Air Traffic Control Tower for the National Air Traffic Services colleagues and Engineers working on site, providing round the clock air traffic services to the Airport. The project forms part of Bristol Airport’s overall multimillion-pound transformational development plan enabling 12 million passengers a year to use the Airport.

Andrew Goodenough, Infrastructure Director, Bristol Airport, said: “This £3.5 million refurbishment project represents a significant milestone in our efforts to modernise our air traffic control infrastructure and continues to ensure the highest levels of safety and efficiency.

"We have worked closely with the Air Traffic Control team and business contract partners to bring these state-of-the-art plans to life. It will be a complex project working with the various teams to ensure the day-to-day operation is disrupted as little as possible, whilst the much needed refurbishment take place.”

The development of Bristol Airport to being a 12 million passenger per annum airport will create thousands of new jobs in the years ahead, open-up new direct air links and support inbound tourism.

This project is one of many to enhance the customer experience and facilities at Bristol Airport whilst meeting the challenge of developing in an environmentally friendly way and the commitment in being a net zero airport operation by 2030.

Advertisement
ODU RT

 

 

 

 


 

Advertisement
FIA2026 animated banner
CAA warns of risks posed by incorrectly packed batteries

Aerospace Security

CAA warns of risks posed by incorrectly packed batteries

26 June 2026

Ahead of the big summer getaway where over 60 million people are expected to be flying, the UK Civil Aviation Authority (CAA) is telling all passengers to 'pack right for a safe flight' by taking their batteries in the cabin with them.

University of Bristol study looks at reducing vertical air taxi noise

Aerospace

University of Bristol study looks at reducing vertical air taxi noise

25 June 2026

The University of Bristol has published a study in Applied Acoustics this week, showing how landing pad design could reduce noise for vertical air taxis.

Digital Twin solutions set to deliver on UK-wide industrial transformation

Aerospace Defence Security

Digital Twin solutions set to deliver on UK-wide industrial transformation

24 June 2026

Digital Catapult has concluded its inaugural Digital Twin Adoption Accelerator which showcased cutting-edge digital twin solutions developed by nine small-to-medium sized enterprises (SMEs) from across the UK.

Intelligent Energy advances commercial hydrogen aviation

Aerospace

Intelligent Energy advances commercial hydrogen aviation

24 June 2026

Intelligent Energy has successfully completed H2GEAR (Hydrogen Electric Aircraft Propulsion System) - the UK’s flagship hydrogen aviation research programme - and is now applying the technology, expertise and infrastructure developed through the project to its next phase: commercial hydrogen fuel cell systems for zero-emission aircraft.

Advertisement
ODU RT
Gatwick Northern Runway Project cleared for take-off by High Court

Aerospace

Gatwick Northern Runway Project cleared for take-off by High Court

23 June 2026

The High Court in London has today upheld the UK Government’s decision to grant consent for Gatwick Airport’s Northern Runway Project.

Altus Group expands portfolio with SEHO partnership

Aerospace Defence

Altus Group expands portfolio with SEHO partnership

23 June 2026

Redditch based Altus Group has announced a new partnership with SEHO Systems GmbH, a German manufacturer specialising in wave and selective soldering systems, automation technology as well as THT inspection solutions.

Advertisement
ODU RT
Advertisement
FIA2026 animated banner