Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide

Aerospace Events

FIA 2016: Airbus demos inspection by drone

Airbus has demonstrated a visual quality inspection on an A350 XWB aircraft using a drone at the Farnborough International Airshow (FIA).



Above:
The A350 XWB receives a quality inspection by a drone.

The drone, equipped with a high definition camera, performs visual inspection for the upper part of the aircraft. It is flown using an automatic flight control system supervised by a human pilot. The Unmanned Aerial Vehicle (UAV) follows a predetermined flight path and takes a series of pictures automatically.

Advertisement
ODU RT

All these images and especially those showing any potential non-quality such as scratches, dents and painting defects, are compiled in a 3D digital model, recorded in a database and then analysed. This data helps improve traceability, prevention and reduction of damage.

Above: Airbus 3D digital model based on drone pictures.

The benefits of this innovative tool and process are significant. Aircraft downtime for inspection is reduced. Data acquisition by drone only takes 10 to 15 minutes, instead of two hours using conventional methods.

“The use of this new technology offers better working conditions including improving the safety and comfort for the quality inspectors”, says Nathalie Ducombeau, Airbus head of quality.

Advertisement
ODU RT

Operators no longer need to go up on a telescopic handler to perform the visual inspection, sometimes in poor weather conditions. In addition, picture analysis can be done anytime afterwards and in an office.

Aircraft visual inspections are an important part of the production process. It is part of the Airbus quality standards.

A full-scale industrial test is being conducted on A330 aircraft. Airbus is working on implementation on other programmes.

 

Advertisement
Gulfstream banner
MGI conducts first TigerShark flights with Auterion

Aerospace Defence Security

MGI conducts first TigerShark flights with Auterion

2 April 2026

MGI Engineering Ltd (MGI) has announced the successful first flights of its TigerShark uncrewed deep strike platform, in partnership with Auterion.

Loganair, Royal Mail and BETA advance electric aviation operations

Aerospace

Loganair, Royal Mail and BETA advance electric aviation operations

1 April 2026

Loganair, Royal Mail and BETA Technologies, today announced the successful completion of the UK's first electric flight demonstration programme across Scotland's regional air network.

SYMCA grant unlocks Rolls-Royce investment in Rotherham ABCF

Aerospace

SYMCA grant unlocks Rolls-Royce investment in Rotherham ABCF

1 April 2026

Rolls-Royce has announced a £19.3 million investment in its highly specialised Advanced Blade Casting Facility (ABCF) in Rotherham, following a grant of £2 million from the South Yorkshire Mayoral Combined Authority (SYMCA).

Rolls-Royce to advance UltraFan 30 demonstrator through UNIFIED

Aerospace

Rolls-Royce to advance UltraFan 30 demonstrator through UNIFIED

31 March 2026

Rolls-Royce has secured €64million in funding from the European Union’s Clean Aviation Joint Undertaking (CAJU) to lead UNIFIED (Ultra Novel and Innovative Fully Integrated Engine Demonstrations), a collaborative research project supporting the development and planned ground testing of the UltraFan 30 demonstrator.

Advertisement
ODU RT
IATA sees strong air passenger and cargo demand growth for February

Aerospace

IATA sees strong air passenger and cargo demand growth for February

31 March 2026

The International Air Transport Association (IATA) has released data for February 2026 showing global passenger demand was up 6.1% and air cargo demand rose by 11.2%, compared to February 2025 levels.

CAA publishes Initial Proposals for Heathrow H8 price cap

Aerospace

CAA publishes Initial Proposals for Heathrow H8 price cap

31 March 2026

The UK Civil Aviation Authority (CAA) has today published its Initial Proposals for the maximum fees that Heathrow Airport Limited (HAL) can charge airlines for using the airport for the H8 regulatory period, which runs from January 2027 until the end of 2031.

Advertisement
ODU RT
Advertisement
FIA2026 animated banner