Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Aerospace
  • /
  • GKN Aerospace to lead fan tech development for electric aircraft

Aerospace

GKN Aerospace to lead fan tech development for electric aircraft

In a project which will span over one and half years, GKN Aerospace and KTH (the Swedish Royal Institute of Technology) will together develop fan technology for smaller regional aircraft.

Image courtesy GKN Aerospace

The project will study aerodynamic design, performance, noise and manufacturing technology for a nested fan powered by electricity, either from batteries, hydrogen fuel cells or even more conventional hybrid propulsion solutions.

The proposed propulsion solution with a nested fan instead of a conventional propeller offers significant advantages in three main areas: safety, noise level and engine installation. By rapidly demonstrating fan technology for electric aviation, the EleFanT project will accelerate the pace of electric aviation development and position the participants for international aero-engine and aircraft development projects.

Advertisement
ODU RT

Europe's aviation industry has set clear targets and adopted an ambitious roadmap to achieve net zero emissions by 2050. Parallel development of different types of propulsion solutions for aircraft engines is one of the important steps to take. GKN Aerospace in Trollhättan, Sweden with its innovative aero-engine solutions and KTH with its wealth of experience in technology development can make a vital contribution to this technology step.

"We are very positive about this initiative, which helps us to become part of the solution to aviation's climate challenge. We will benefit greatly from GKN Aerospace and KTH's long experience in turbomachines, lightweight construction and advanced manufacturing technology. From an electrification and sustainability perspective the project is strongly aligned with our recently announced H2GEAR and H2JET programmes." said Henrik Runnemalm, Vice President GKN Aerospace Global Technology Centre in Trollhättan, Sweden.

Advertisement
ODU RT

 

Advertisement
FIA2026 animated banner
MGI conducts first TigerShark flights with Auterion

Aerospace Defence Security

MGI conducts first TigerShark flights with Auterion

2 April 2026

MGI Engineering Ltd (MGI) has announced the successful first flights of its TigerShark uncrewed deep strike platform, in partnership with Auterion.

Loganair, Royal Mail and BETA advance electric aviation operations

Aerospace

Loganair, Royal Mail and BETA advance electric aviation operations

1 April 2026

Loganair, Royal Mail and BETA Technologies, today announced the successful completion of the UK's first electric flight demonstration programme across Scotland's regional air network.

SYMCA grant unlocks Rolls-Royce investment in Rotherham ABCF

Aerospace

SYMCA grant unlocks Rolls-Royce investment in Rotherham ABCF

1 April 2026

Rolls-Royce has announced a £19.3 million investment in its highly specialised Advanced Blade Casting Facility (ABCF) in Rotherham, following a grant of £2 million from the South Yorkshire Mayoral Combined Authority (SYMCA).

Rolls-Royce to advance UltraFan 30 demonstrator through UNIFIED

Aerospace

Rolls-Royce to advance UltraFan 30 demonstrator through UNIFIED

31 March 2026

Rolls-Royce has secured €64million in funding from the European Union’s Clean Aviation Joint Undertaking (CAJU) to lead UNIFIED (Ultra Novel and Innovative Fully Integrated Engine Demonstrations), a collaborative research project supporting the development and planned ground testing of the UltraFan 30 demonstrator.

Advertisement
ODU RT
IATA sees strong air passenger and cargo demand growth for February

Aerospace

IATA sees strong air passenger and cargo demand growth for February

31 March 2026

The International Air Transport Association (IATA) has released data for February 2026 showing global passenger demand was up 6.1% and air cargo demand rose by 11.2%, compared to February 2025 levels.

CAA publishes Initial Proposals for Heathrow H8 price cap

Aerospace

CAA publishes Initial Proposals for Heathrow H8 price cap

31 March 2026

The UK Civil Aviation Authority (CAA) has today published its Initial Proposals for the maximum fees that Heathrow Airport Limited (HAL) can charge airlines for using the airport for the H8 regulatory period, which runs from January 2027 until the end of 2031.

Advertisement
ODU RT
Advertisement
Gulfstream banner