Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Defence
  • /
  • Nesscliff Training Camp net-zero carbon smart buildings officially opened

Defence

Nesscliff Training Camp net-zero carbon smart buildings officially opened

The MoD’s Climate Change and Sustainability Lead, Lt Gen Richard Nugee, has officially opened three new environmentally friendly buildings at Nesscliff Training Camp in Shropshire.

The accommodation blocks form part of a wider investment being undertaken by the Defence Infrastructure Organisation (DIO). The programme is being part-funded using money from a £200-million investment to improve UK Armed Forces accommodation, which was announced by the Defence Secretary last summer. £45-million is being invested in building new carbon-efficient accommodation on the Defence Training Estate in a project called the Net-Zero Carbon Accommodation Programme (NetCAP).

Advertisement
Advanced Engineering RT

Lt Gen Nugee was briefed on the programme, which will see over 40 new carbon-efficient accommodation blocks, providing more than 1,900 bed spaces, installed across the country by DIO. The blocks are being built by modular construction specialist Reds10, through DIO’s contract with industry partner Landmarc Support Services.

Above: Lt Gen Richard Nugee officially opens the buildings, accompanied by dignitaries including Brigadier Jonathan Bartholomew, DIO’s Head of Overseas and Training Region, Mark O’Neill, Landmarc’s Managing Director and Paul Ruddick, Chairman of Reds10.
Copyright Landmarc Support Services 2021

The General also watched the demolition of some 1930s Nissen huts, which will be replaced with more of the NetCAP buildings in a second phase at Nesscliff later this year. He then toured the three completed buildings with Paul Ruddick, Reds10 Chairman and cut the ribbon to officially open the new accommodation.

The first NetCAP building opened at Westdown Camp on Salisbury Plain last summer and has since been followed by other new carbon-efficient blocks at Castlemartin Training Area in Pembrokeshire, Brunswick Camp in Surrey and Knook Camp, also on Salisbury Plain. Each new block is an iteration on the same design, with the Reds10 team looking at ways to reduce energy use and embodied carbon for each new version.

The three buildings at Nesscliff have improved on the Westdown Camp proof of concept and have an Energy Performance Certificate rating of –5, thanks to solar panels on the roof, air source heat pumps and a heat recovery system in the showers and drying rooms. This means they will be able to generate power for the site, reducing electricity costs.

The team were also able to reduce embodied carbon by 30% at Nesscliff, as compared to the Westdown Camp prototype. Smart technology in the blocks allows Landmarc to monitor energy use, how the buildings are being used and if necessary, make changes remotely to all the NetCAP buildings. This further helps to reduce energy use and running costs.

Brigadier Jonathan Bartholomew, DIO’s Head of Overseas and Training Region said: "I was delighted to welcome Lt Gen Nugee to Nesscliff Training Camp and show him these buildings, which are a testament to the MoD’s commitment to sustainability. As our Climate Change and Sustainability lead, he took a real interest in all of the steps being taken to make the blocks as efficient as possible.

"As well as being as sustainable as we can make them, these new modular built blocks are the sort of high-quality accommodation our serving personnel deserve, which helps them to give their best during a training exercise."

Advertisement
Marshall RT 2

Mark Neill, Managing Director at Landmarc, said: "We are committed to supporting the MOD and DIO with their net zero carbon goals, so this was a great opportunity to show Lt Gen Nugee how we’re driving down carbon by improving building standards across the Defence Training Estate.

"Not only is this investment helping to deliver a more sustainable estate but it also supports the government aim to improve living accommodation for our Armed Forces, whilst helping to kick start the economy by using an end-to-end UK supply chain."

Paul Ruddick, Chairman of Reds10 said: "We are delighted to be delivering continuous improvements to the programme, alongside DIO and Landmarc, with each NetCAP building. The programme is leading the way in the government’s commitment to build back better, greener and faster. The buildings at Nesscliff Training Area truly showcase how agile the approach to the programme has been, from the very start. It was an absolute pleasure to be able to show Lt Gen Nugee the buildings personally.

"The remainder of the £200-million investment is being spent on Service Family Accommodation and training accommodation at Longmoor Training Camp, and improvements to Single Living Accommodation in army barracks, RAF bases and naval establishments."


 

 

 

Advertisement
L3Harris L3Harris
NP Aerospace extends Ukraine support with Norway contract

Defence

NP Aerospace extends Ukraine support with Norway contract

24 April 2024

NP Aerospace is continuing its support for Ukraine with the delivery of a further 2,000 sets of body armour and carrier vests via Norway and the UK Ministry of Defence.

PA Consulting launches Secure Futures report

Defence Security Space

PA Consulting launches Secure Futures report

24 April 2024

PA Consulting has announced the launch of its Secure Futures report, part of its Secure Futures series providing insights and events emphasising the importance of collaboration in delivering a secure future.

DASA seeks novel testing and evaluation for defence

Defence

DASA seeks novel testing and evaluation for defence

24 April 2024

The Defence and Security Accelerator (DASA) has launched a new Innovation Focus Area (IFA) called Unlocking the True Potential of Test and Evaluation for Defence, run on behalf of the Ministry of Defence (MoD).

UK set to increase defence spending to 2.5% by 2030

Defence

UK set to increase defence spending to 2.5% by 2030

24 April 2024

Prime Minister Rishi Sunak has announced that the UK will increase defence spending to 2.5% by 2030.

Advertisement
Marshall RT
BMT partners with DNV to advance Australian Landing Craft design

Defence

BMT partners with DNV to advance Australian Landing Craft design

24 April 2024

BMT has signed a Memorandum of Understanding (MoU) with classification society DNV, primarily aimed at advancing BMT’s development of an Australian version of its CAIMEN Large Design for the future Landing Craft – Heavy (LC-H) programme, for the Australian Army.

BMT SPARO project secures British Army funding

Defence

BMT SPARO project secures British Army funding

23 April 2024

In a major development for the BMT SPARO project, the British Army’s Futures Directorate has provided funding to build, supply and demonstrate the latest prototype for UK medics who took part in Project CONVERGENCE, the premier US Army experimentation exercise in March.

Advertisement
ODU RT 2