Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Defence
  • /
  • Pilot project launched to reduce energy use on MoD estate

Defence

Pilot project launched to reduce energy use on MoD estate

A pilot project to refurbish a 45-year-old RAF barrack block at St Mawgan, Cornwall, to meet government energy targets, has been launched by the Defence Infrastructure Organisation (DIO) and its contractor VIVO Defence Services.



Image courtesy DIO

 
The project is the first of its type for UK military Single Living Accommodation (SLA) and aims to show how retrofitting accommodation blocks with carbon reducing technology is a cheaper and alternative way of meeting MoD net zero commitments.

Buildings of its age would not typically meet Government energy targets but DIO asked VIVO Defence Services to run a pilot to determine if refurbishing the building could make it compliant.
 
Baker Block is a brick built two-storey SLA building consisting of cavity walls and a pitched roof. The improvements will involve overlaying the existing building with external insulation cladding, adding triple glazed windows, a new roof and an air source heat pump system. Smart metering will also be built in so energy use can be controlled depending on the need in real time, allowing heating and lighting systems to be turned on or off instantly depending on the data.

Advertisement
ODU RT

The refit will convert the block into 26 single use rooms with en-suites, as well as providing enhanced kitchens areas and welfare spaces. If successful, the pilot project could be used as a blueprint to enhance and refurbish other MoD buildings.

The work on Baker Block follows the introduction of new Building Performance Standards (BPS) in 2021 stating new or refurbished buildings should have an overall energy use intensity (EUI) of no more than 35 kWh/m², compared to the previous 150 kWh/m² target. This will help the MoD on its continuing journey to support the government’s ambition to achieve net zero by 2050. Baker Block is scheduled for completion next year and is expected to provide an EUI of 33.2 kWh/m².
 
Once completed the building will undergo rigorous tests to determine whether it is achieving the projected energy savings. This will then in turn help to identify if refurbishment projects of this nature realise and offer the best cost solution to improving estate infrastructure.

Advertisement
Security & Policing Rectangle

Gary Hawkey, Project Lead for DIO Regional Delivery South West, said: “We’re really pleased to be working on this project, which will both improve conditions for the service personnel living in the accommodation and improve energy efficiency. Retrofitting is fantastic option as it can reduce the length of the project and the amount of disruption on site.”

Wing Commander Barry Robinson, from the Royal Air Force’s Air Infra Sustain & Regional Delivery section at HQ Air Command, said: “The RAF are proud to collaborate with the Defence Infrastructure Organisation and VIVO Defence Services on these pilot projects.  
 
“Retrofitting these buildings represents a significant step towards helping the MoD achieve its net zero carbon emissions targets. Additionally, it sets a precedent for how we approach infrastructure projects across the estate in the future. Beyond contributing to sustainability goals, these efforts will deliver long-term value for money and enhance the quality of life for our personnel living on the base”.
 
Amanda Hill, Operations Director at VIVO Defence Services, added: “We are very excited to carry out this project at RAF St Mawgan. It is one of several ongoing projects we at VIVO are completing across the military-built estate to help the MoD cut energy use costs effectively as part of its net zero aims, whilst also improving the lived experience of personnel living on the base.”

Advertisement
General Atomics LB
NMITE and British Army reveal details of autonomous robotics degree

Defence Events

NMITE and British Army reveal details of autonomous robotics degree

21 January 2026

Following on from the December announcement of its new Autonomous Robotics degree, the New Model Institute for Technology and Engineering (NMITE) hosted an event today in conjunction with the British Army to provide more information about its groundbreaking MEng (Hons) Integrated Engineering (Autonomous Robotics) which will welcome its first ...

Challenger 3 conducts first-ever crewed live firing trials

Defence

Challenger 3 conducts first-ever crewed live firing trials

20 January 2026

Rheinmetall BAE Systems Land (RBSL) has successfully completed the first crewed live firing of Challenger 3, marking a significant step towards delivery of the British Army’s next-generation main battle tank.

Cross Manufacturing to expand AS9100 accreditation

Aerospace Defence

Cross Manufacturing to expand AS9100 accreditation

20 January 2026

To meet demands from industry, Cross Manufacturing is looking to expand AS9100 accreditation to all three of its manufacturing plants, increasing its capacity for the design and production of precision engineered high temperature metallic sealing rings, retaining rings, brush seals and machined components for aerospace and defence applications.

GeoCue partners with Coptrz to expand TrueView LiDAR in UK drone market

Aerospace Defence Security

GeoCue partners with Coptrz to expand TrueView LiDAR in UK drone market

20 January 2026

UK drone specialists Coptrz have joined forces with GeoCue to offer the complete TrueView LiDAR product range, from entry-level to engineering-grade solutions.

Advertisement
ODU RT
JFD Global to collaborate with ST Engineering Marine in Singapore

Defence Security

JFD Global to collaborate with ST Engineering Marine in Singapore

19 January 2026

James Fisher Defence (JFD Global) has signed a Memorandum of Understanding (MoU) with ST Engineering Marine to explore new opportunities for collaboration in Singapore and beyond.

QinetiQ extends Typhoon engineering services contract with MoD

Defence

QinetiQ extends Typhoon engineering services contract with MoD

19 January 2026

QinetiQ today announced a five-year extension worth £205 million, with the UK Ministry of Defence (MoD), to continue to deliver mission critical engineering services for the Royal Air Force’s Typhoon aircraft.

Advertisement
Security & Policing Rectangle
Advertisement
General Atomics LB