Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Aerospace
  • /
  • TÜV SÜD investment reduces manufacturers’ time to market

Aerospace Defence

TÜV SÜD investment reduces manufacturers’ time to market

TÜV SÜD has invested more than £300,000 in its environmental testing facilities, reducing test waiting times and time to market for aerospace and defence equipment manufacturers.

Above: TÜV SÜD's new fast rate of change climatic test facility.
Courtesy  TÜV SÜD

The upgrade includes a third fast rate of change climatic test facility, a complete refurbishment of its drive-in climatic test chamber and an increase in vibration testing capabilities.
 
The bespoke fast rate of change test chamber is the only one of its kind. It will increase significantly TÜV SÜD’s climatic test capacity, reducing test waiting times and time to market for aerospace and defence equipment manufacturers. The chamber replicates rapid and extreme environmental temperature variations, covering a wide range of fluctuations from minus-70 °C to plus-120 °C, with rapid temperature change rates of up to 10°C per minute.

Advertisement
PTC rectangle

 
Part of TÜV SÜD’s investment also includes a complete refurbishment of its drive-in 120 m³ climatic test chamber, as part of its proactive upgrade and maintenance strategy to futureproof test services. One of the largest commercial drive-in test chambers in Europe, it can accommodate entire vehicles or substantial aerospace components and systems. 
 
The addition of new high-force and medium-force shakers will enable TÜV SÜD to deliver vibration testing at higher levels, to better simulate real-world scenarios for shock, vibration and temperature. The increase in vibration testing capability will reduce substantially test lead times for manufacturers.
 
Advertisement
ODU RT

Chris Bowles, Environmental Test Supervisor at TÜV SÜD, said: “Manufacturers are operating in a highly competitive market but they must also adhere to complex standards to ensure the reliability and safety of their products. TÜV SÜD’s investment will help them to realise this, but they will also benefit from reduced test waiting times which will help them to achieve a rapid time to market.
 
“The new fast rate of change chamber is built to a bespoke design, following feedback from our engineers on the innovations that we could introduce to streamline the test process to help our customers. The new and upgraded chambers, alongside our improved vibration testing capacity, complement our already comprehensive selection of environmental and EMC services. Manufacturers can now access the full range of tests from a single location.”
 

Advertisement
FIA2026 animated banner
Atlas Air Worldwide orders 20 A350Fs

Aerospace

Atlas Air Worldwide orders 20 A350Fs

16 March 2026

Atlas Air Worldwide has placed a landmark firm order for 20 Airbus A350F freighters, which is the largest ever placed for the A350F and makes Atlas the biggest customer of the type.

Astra Group completes delivery of Manchester Airport wayfinding contract

Aerospace

Astra Group completes delivery of Manchester Airport wayfinding contract

13 March 2026

Manchester based provider of traditional and digital signage solutions, Astra Group, has completed on a seven-figure wayfinding contract for Manchester Airport.

AirportsUK urges government to help increase competitiveness

Aerospace

AirportsUK urges government to help increase competitiveness

12 March 2026

At last night's AirportsUK Annual Dinner, senior aviation executives and politicians were given an insight into the size of the prize if government worked with the sector to increase competitiveness.

UK-first achieved in advanced materials

Aerospace Defence Space

UK-first achieved in advanced materials

11 March 2026

The UK has established its first sovereign manufacturing capability for ultrahigh temperature materials - vital for space, hypersonic and propulsion systems.

Advertisement
ODU RT
Smith Myers and HAT.tec integrate ARTEMIS with SCALE

Aerospace Security

Smith Myers and HAT.tec integrate ARTEMIS with SCALE

11 March 2026

Smith Myers Communications and HAT.tec have announced the integration of the ARTEMIS Mobile Phone Detection and Location System (MPDLS) with the HAT.tec mission management system SCALE across the helicopter fleet of a major European law enforcement agency.

BBGA hosts annual conference and AGM at 50

Aerospace

BBGA hosts annual conference and AGM at 50

11 March 2026

The British Business and General Aviation Association (BBGA) will host its annual conference and AGM on 12th March in London, 50 years on from the formation of its antecedent, the General Aviation Manufacturers’ and Traders’ Association (GAMTA).

Advertisement
PTC rectangle
Advertisement
Gulfstream banner