in Aerospace / Defence

TÜV SÜD investment reduces manufacturers’ time to market

Posted 11 March 2020 · Add Comment

TÜV SÜD has invested more than £300,000 in its environmental testing facilities, reducing test waiting times and time to market for aerospace and defence equipment manufacturers.



Above:
TÜV SÜD's new fast rate of change climatic test facility.
Courtesy  TÜV SÜD


The upgrade includes a third fast rate of change climatic test facility, a complete refurbishment of its drive-in climatic test chamber and an increase in vibration testing capabilities.
 
The bespoke fast rate of change test chamber is the only one of its kind. It will increase significantly TÜV SÜD’s climatic test capacity, reducing test waiting times and time to market for aerospace and defence equipment manufacturers. The chamber replicates rapid and extreme environmental temperature variations, covering a wide range of fluctuations from minus-70 °C to plus-120 °C, with rapid temperature change rates of up to 10°C per minute.
 
Part of TÜV SÜD’s investment also includes a complete refurbishment of its drive-in 120 m³ climatic test chamber, as part of its proactive upgrade and maintenance strategy to futureproof test services. One of the largest commercial drive-in test chambers in Europe, it can accommodate entire vehicles or substantial aerospace components and systems. 
 
The addition of new high-force and medium-force shakers will enable TÜV SÜD to deliver vibration testing at higher levels, to better simulate real-world scenarios for shock, vibration and temperature. The increase in vibration testing capability will reduce substantially test lead times for manufacturers.
 
Chris Bowles, Environmental Test Supervisor at TÜV SÜD, said: “Manufacturers are operating in a highly competitive market but they must also adhere to complex standards to ensure the reliability and safety of their products. TÜV SÜD’s investment will help them to realise this, but they will also benefit from reduced test waiting times which will help them to achieve a rapid time to market.
 
“The new fast rate of change chamber is built to a bespoke design, following feedback from our engineers on the innovations that we could introduce to streamline the test process to help our customers. The new and upgraded chambers, alongside our improved vibration testing capacity, complement our already comprehensive selection of environmental and EMC services. Manufacturers can now access the full range of tests from a single location.”
 

* required field

Post a comment

Other Stories
Advertisement
Latest News

CFMS study bolsters business case for regional electric aircraft

A new study from the Centre for Modelling & Simulation (CFMS), a not-for-profit specialist in digital engineering, has helped the aerospace industry move a step closer to the development of regional electric aircraft.

Industry poll shows gradual aviation recovery

The consensus from a major industry poll conducted as part of FlightPlan: Charting a Course into the Future - an online broadcast by Inmarsat and the Airline Passenger Experience Association (APEX) - has highlighted that the commercial

Two Rivers Recruitment hires Marion McColl

Marion McColl, a highly experienced recruitment sector consultant, has joined the team at rapidly expanding Glasgow-based aerospace and defence recruitment specialist, Two Rivers.

MoD signs £65m contract for Protector

A £65 million contract to build the UK’s first three Protector aircraft, the first UK operated system capable of strike missions anywhere in the world, has been signed by the Ministry of Defence (MoD).

Young people tackle Earth's problems from space

Some of the UK’s best and brightest young minds have been awarded for their imaginative ideas to combat global and local problems using space.

DASA Countering Drones Phase 2 competition gains extra funding

An additional £1.5 million funding is being allocated to the Defence and Security Accelerator’s (DASA) Countering Drones competition.

Getac SK0707210720
See us at
DVD 2020