Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Space
  • /
  • Thales Alenia Space wins ESA study contract to develop payload to extract Oxygen on the Moon

Space

Thales Alenia Space wins ESA study contract to develop payload to extract Oxygen on the Moon

Thales Alenia Space, a joint venture between Thales (67%) and Leonardo (33%), has signed a study contract with the European Space Agency (ESA) worth one million euros for a payload concept to extract oxygen from Moon rock.

Above: Indicative Lunar lander with In Situ Resource Utilisation (ISRU) payload.
Copyright Redwire Space Europe

For a sustainable habitation on the Moon, humans will need to utilise resources that they find on the Moon rather than transport these resources from Earth; one of these resources is oxygen. Thales Alenia Space teams in the UK have worked with AVS, Metalysis, Open University and Redwire Space Europe to specify a demonstration payload for a European Space Agency Lunar Mission that uses molten salt and electrolysis to extract oxygen from Moon rock ‘regolith’.  

Advertisement
DSEI 2025

The winning proposal from an ESA competition between multiple industrial consortia, this payload concept will demonstrate that In Situ Resource Utilisation (ISRU) can be performed on the Moon efficiently and to produce oxygen in the quantities required by future Moon colonies.
Andrew Stanniland, CEO of Thales Alenia Space in the UK commented “This contract award is incredibly exciting. The adaption of processes and tools to the space environment, many of which we take for granted on Earth, will be critical in many areas of our future. I am proud that our dedicated teams will be leading this study together with our valued partners AVS, Metalysis, Open University and Redwire Space Europe to solve the complex challenge of creating oxygen to sustain life on the lunar surface.”
 
David Binns Systems Engineer at ESA's Concurrent Design Facility added: "ESA is looking forward to working with Thales Alenia Space in the UK and their partners to develop an oxygen extraction demonstrator further as part of the space resources initiative. Finding solutions to the challenges posed to make sustainable lunar exploration a reality.”

Thales Alenia Space at the heart of the Lunar industrial challenge.
Thales Alenia Space, already responsible for the thermomechanical systems on the European service module for Orion, is heavily involved in the European Space Agency's contribution to the  Lunar Gateway with the development of the I-HAB (International - Habitat) and ESPRIT (European System Providing Refuelling, Infrastructure and Telecommunications) modules. For Northrop Grumman, Thales Alenia Space is also developing the pressurized module for HALO (Habitation And Logistics Outpost), one of the first two elements of the Lunar Gateway, to be launched by the end of 2023.

Advertisement
Gulfstream RT

The Lunar Space Station, Gateway
The Lunar Gateway is one of the pillars of NASA’s Artemis program, supporting a sustainable presence on the Moon and exploration beyond. It’s an international project, led by the two main contributors NASA (United States) and ESA (Europe). Weighing about 40 metric tons, the Gateway will be automatically assembled piece by piece and placed in a “near rectilinear halo orbit” (NRHO) around the Moon. It mainly comprises habitation modules for the crew, power and propulsion systems, logistics modules, communications systems, a robotic arm and docking ports. It is not intended for permanent occupancy, but will be able to host 4-person crews for periods of one to three months. Gaining new experience around the Moon will prepare NASA to send the first humans to Mars as from 2030 – and the Gateway will play a key role in this process.

Studies for a sustained human presence on the Moon
Along with current projects Thales Alenia Space has also been chosen to design advanced solutions for a sustained human presence on the Moon. One of these visionary studies is EL3, or the European Large Logistic Lander (EL3). A free-standing part of international lunar exploration activities, it’s a versatile system designed to support a variety of missions. It is aimed to provide cargo and logistics services for NASA-led lunar missions via Artemis and support a European mission to study the Lunar South Pole with a robotic laboratory derived from the designed sample fetch rover.
 

Advertisement
Cranfield University
Rocket test facility set to support UK space sector

Space

Rocket test facility set to support UK space sector

23 July 2025

A Cold War-era armoured building close to the Mull of Kintyre is set to see action again as the base for a cutting-edge rocket test and teaching facility.

UK Moonlight team expands

Space Events

UK Moonlight team expands

18 July 2025

Viasat, SSTL and MDA Space have announced they are working together to develop designs and proposals for a lunar orbiting communications satellite system around the Moon, called Moonlight.

MDA Space UK to prime ESA and UKSA regenerative 5G D2D comms from LEO

Space

MDA Space UK to prime ESA and UKSA regenerative 5G D2D comms from LEO

16 July 2025

MDA Space Ltd today announced that it will prime SkyPhi, a new mission funded by the European Space Agency (ESA) and the UK Space Agency (UKSA) that will enable regenerative 5G direct-to-device (D2D) satellite communications from Low Earth Orbit (LEO).

University of Surrey launches Space Institute

Space

University of Surrey launches Space Institute

16 July 2025

With the UK's £19 billion space economy surging, government and industry urgently need faster research, innovation and skilled talent – yet more than half of space organisations report critical shortages, a challenge now being tackled by the newly launched Surrey Space Institute at the University of Surrey.

Advertisement
Gulfstream RT
Pioneering programme to develop horizontal space launch

Space

Pioneering programme to develop horizontal space launch

15 July 2025

Ahead of the UK Space Conference (Manchester, 16th-17th July 2025), Frazer-Nash has announced it is leading a new research programme, known as INVICTUS, to develop a comprehensive concept design for a vehicle and its integrated systems, with the goal of building and flying a Mach 5-capable aircraft at the edge of space by early 2031.

Celestia UK starts building world’s first Ka-band multi-beam gateway

Space Events

Celestia UK starts building world’s first Ka-band multi-beam gateway

15 July 2025

Celestia UK is announcing at the UK Space Conference 2025 (Manchester, 16th-17th July 2025) that it has commenced the preproduction stage of a new generation of ground station gateway.

Advertisement
ODU RT