Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Defence
  • /
  • Type 26 frigate HMS Glasgow more than half built

Defence

Type 26 frigate HMS Glasgow more than half built

Construction of the future HMS Glasgow, the lead ship of the Royal Navy’s future Type 26 frigates, is advancing at BAE Systems’ Govan shipyard.

Above: The forward section of HMS Glasgow under construction at BAE Systems’ Govan shipyard.
Courtesy Royal Navy

The ship is being built in numerous sections – or ‘units’, each one constructed in BAE’s fabrication facility at their Govan yard, with the fore and aft sections of the 8,000-tonne warship being built separately. From there, once complete, the units are wheeled to the ship block and outfit hall where they are joined together and pipes and cabling linked up.

Advertisement
DSEI 2025

Just over half of HMS Glasgow is now complete or under construction, out of eight planned vessels in the class (all are named, three have been ordered, two are in build at Govan – HMS Cardiff is No.2).

Once the fore and aft sections are complete they will be joined on the hard in front of the block hall, before the bridge/main mast are craned into place.

The completed ship will then be ‘launched’ by being lowered into the Clyde via a barge, then towed downstream to BAE’s yard at Scotstoun to complete fitting out.

The Type 26s replace the ‘souped-up’ anti-submarine Type 23s which will begin retiring from service later this decade after more than 30 years on patrol, while still to come are five Type 31 general duty frigates which have yet to be ordered/named and will replace their five Type 26 counterparts like for like.

Advertisement
Teledyne

Well over 1,500 people are involved in the Type 26 programme – not just at BAE on the Clyde but nationwide – with an estimated 3,400 jobs created or supported when construction is in full swing.

 

Advertisement
PTC PTC
GKN Aerospace secures Typhoon transparencies contract

Defence

GKN Aerospace secures Typhoon transparencies contract

10 July 2025

GKN Aerospace has has signed a six-year follow-on contract with BAE Systems for continued manufacture of Eurofighter Typhoon transparencies at its Luton facility, through to the end of 2030.

Metis to supply Skyperion to NATO ally

Defence Security

Metis to supply Skyperion to NATO ally

10 July 2025

Metis has won a contract to supply a number of Skyperion drone detection systems to a NATO customer to provide the drone detect function as part of an integrated Counter Uncrewed Air Systems (C-UAS) capability.

ALL.SPACE unveils Hydra MAX

Defence Space

ALL.SPACE unveils Hydra MAX

10 July 2025

ALL.SPACE has revealed a major advancement in mobile satellite communications with the successful demonstration of Hydra MAX - the first network independent terminal of its kind to deliver ultra wideband communications to multiple satellites simultaneously.

BAE Systems assessed

Defence

BAE Systems assessed 'Awardable' for US DoD work in P1 Solutions Marketplace

9 July 2025

BAE Systems in collaboration with Defense Unicorns, have announced that their joint solution has achieved 'Awardable' status for US Department of Defense (DoD) work through the US Platform One (P1) Solutions Marketplace.

Advertisement
Teledyne
Government unveils Team UK approach to defence

Defence

Government unveils Team UK approach to defence

8 July 2025

UK Government plans to deliver jobs across the country by unlocking the full economic potential of Britain's defence sector are being unveiled today.

Construction begins on SLA accommodation at RAF Cosford

Defence

Construction begins on SLA accommodation at RAF Cosford

8 July 2025

Construction has started on a new 50-bedroom Single Living Accommodation (SLA) block at RAF Cosford in Shropshire.

Advertisement
Gulfstream RT