Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Defence
  • /
  • Gama and the RAF partying out of the Shadows

Defence

Gama and the RAF partying out of the Shadows

Farnborough headquartered Gama Group was celebrating last night as the Royal Air Force's Shadow R1 special mission fleet' achieved its 10,000th operational flight hour.

A special ceremony was held at RAF Waddington by the RAF’s No.14 Squadron, to mark the achievement of its Shadow R1 aircraft fleet’s milestone.

Wing Commander Rich Moir, Officer Commanding 14 Squadron, said: "Marking the 10,000th operational hour for the Shadow R1 is very important as it is a significant milestone, and stands as testament to the hard work, dedication and determination of all those associated with the success of this unique platform.

Advertisement
Teledyne

Since it was first introduced into service it has had an outstanding serviceability rate and delivered consistently in the skies over Afghanistan.

“ It is an achievement that all associated with the project should be very proud of."

The Shadow R1 is one of a number of platforms Gama supports.

Advertisement
ODU RT

As well as providing UK-based support and logistics supply, Gama provides service engineering teams and supply chains to support the platform around the world.

Gama’s contribution as a member of the Shadow Team headed by Special Project Multi Air Platform Project Team, was recognised earlier this year with the award of a Chief of Defence Materiel’s (CDM) Commendation in recognition of exceptional support to the Royal Air Force and its Shadow R1 special mission fleet in particular.

In addition to the provision of maintenance support both in the UK and overseas, Gama has also been recently appointed to provide specialist training for RAF engineering personnel.

“We appreciate the confidence the MOD have placed in the Gama team in supporting Shadow R1 operations,” said Paul Bristow, Engineering Director, Gama Support Services. “We are committed to expanding our support for the MOD as and when requested, in what we appreciate are particularly challenging operational circumstances and are proud to have the RAF team engineers working under our maintenance approvals as an integral part of the Gama team at our home base of Farnborough and overseas in support of the Shadow Program.”

Advertisement
Babcock LB
BAE Systems

Defence

BAE Systems' Leadership Academy opens in Barrow

14 July 2025

BAE Systems has opened a new Leadership Academy in Barrow to deliver world-class educational facilities for designing and building Royal Navy submarines.

Adarga awarded expanded Defence Support AI contract

Defence

Adarga awarded expanded Defence Support AI contract

14 July 2025

Adarga has been awarded a significantly expanded AI contract by Defence Support, part of the UK Ministry of Defence (MoD).

BlueBear demos autonomous containment tech for RAF

Defence

BlueBear demos autonomous containment tech for RAF

14 July 2025

New safety containment technology for autonomous Uncrewed Aerial Systems (UAS) has been successfully proven in a demonstration as part of the Royal Air Force (RAF) Rapid Capabilities Office (RCO) Project CURBER.

Lane Electronics to showcase defence connectivity at MSPO

Aerospace Defence Events

Lane Electronics to showcase defence connectivity at MSPO

11 July 2025

Lane Electronics, a franchised distributor for many of the industry’s major electrical, electronic and optical connector manufacturers, will be Exhibiting at MSPO 2025 (2nd–5th September 2025, Kielce, Poland), where they will be displaying the latest connector innovations and demonstrating their UK based assembling and value add services.

Advertisement
Gulfstream RT
Flitetec secures two distribution agreements

Aerospace Defence Events

Flitetec secures two distribution agreements

11 July 2025

Amersham based aerospace business Flitetec, has confirmed two major deals that it shook on at the recent Paris Air Show.

GKN Aerospace secures Typhoon transparencies contract

Defence

GKN Aerospace secures Typhoon transparencies contract

10 July 2025

GKN Aerospace has signed a six-year follow-on contract with BAE Systems for continued manufacture of Eurofighter Typhoon transparencies at its Luton facility, through to the end of 2030.

Advertisement
Gulfstream RT