Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Defence
  • /
  • First NetCAP buildings delivered to UK DTE in Scotland

Defence

First NetCAP buildings delivered to UK DTE in Scotland

The MoD’s award-winning Net-Zero Carbon Accommodation Programme (NetCAP) has reached another key milestone by delivering the first NetCAP buildings on the UK Defence Training Estate (DTE) in Scotland.



Above:
An aerial view of the new NetCAP buildings on Greenfield Camp at Garelochhead.
Crown copyright MoD 2023

The first of many NetCAP buildings to be completed at Greenfield Camp in Garelochhead will bring high-quality, versatile and sustainable accommodation to support service personnel as they train for operations worldwide.

Advertisement
PTC rectangle

The buildings were delivered by the MoD’s Defence Infrastructure Organisation (DIO), working with industry partner Landmarc Support Services (Landmarc) and off-site construction specialist Reds10. The accommodation was designed and constructed in Reds10’s East Yorkshire factory before being transported to site.

The first phase of delivery was completed this month, with 51 units combined on site to make up three double-storey accommodation blocks that provide 315 bedspaces. The blocks replace several Nissen huts which were built around 1944 to house troops prior to deployment during WW2, and were retained for training accommodation ever since. The fourth and final accommodation block will be completed by early 2024.

Above: Peter Gentles, DIO Senior Estate Facilities Manager, Ronnie Shields, Landmarc Senior Project Manager, Tom Hook, Reds10 Associate Director & Defence PM Lead and Lt Col Robert Lockhart of the Argyle and Sutherland Highlanders Battalion Army Cadet Force showcase one of the new buildings.
Crown copyright MoD 2023

Brigadier Jonathan Bartholomew, DIO’s Head of Overseas and Training Region, said: "We are delighted to see the installation of these modern accommodation blocks in Greenfield Camp in Garelochhead. It demonstrates the MoD’s commitment to delivering high-quality accommodation for our serving personnel, which helps them to give their best during their training exercises.  

"These blocks, and the wider NetCAP programme are also a testament to the MoD’s commitment to sustainability."

The NetCAP buildings have a Defence Related Environmental Assessment Methodology (DREAM) rating of ‘excellent’ and provide new sustainable accommodation which can be subdivided as necessary. They also include showers, ablutions and drying rooms all in one modern complex, removing the need for troops to move around different buildings.

A variety of innovative green measures have been implemented across NetCAP to ensure long-term operational efficiency. These include solar panels on the roof, air source heat pumps, a rainwater harvesting system and a heat recovery system in the showers and drying rooms. This means the buildings will be able to generate power for the site, reducing electricity costs.

NetCAP has delivered the DTE’s first carbon negative buildings, including these ones in Garelochhead and equips them with SMART building technology that optimises energy use and provides data for improvement, saving energy and reducing maintenance costs. This data was used to drive down Energy Performance Certificate (EPC) ratings from 12 to -10 during the early stages of the programme and an embodied carbon saving of 9,100 tonnes across the programme.

Mark Neill, Managing Director at Landmarc, said: "We are committed to supporting the MoD and DIO with their net zero carbon goals, and this first for Scotland is another example of how we’re driving down carbon by improving building standards across the DTE.

Advertisement
ODU RT

"Not only is this investment helping to deliver a more sustainable estate but it also supports the government’s aim to improve living accommodation for our armed forces, whilst investing in the economy by using an end-to-end UK supply chain."

Phil Cook, Director & Defence Sector Lead of Reds10, said: "We are delighted to be bringing NetCAP to Scotland, alongside DIO and Landmarc. In just 18 weeks on site, the combined team has delivered three double-storey buildings with a fourth to be completed soon after. The use of Modern Methods of Construction (MMC) has meant that units arrive on site up to 90% complete, minimising disruption to a key site on the DTE."

Once complete, the new facilities programme at Garelochhead will deliver four double-accommodation blocks on site and offer a total of 416 new bed spaces for serving troops, cadets and other members of our armed forces and MoD Police during annual training in Scotland.

 

 

    

Advertisement
Gulfstream banner
UK Defence Diplomacy Strategy launched

Defence

UK Defence Diplomacy Strategy launched

24 March 2026

UK military personnel will be put through their paces as part of a new diplomacy training programme, upskilling specialists in negotiation and languages as part of the UK's first Defence Diplomacy Strategy launched today. 

DroneShield and OpenWorks Engineering expand C2 interoperability

Defence Security

DroneShield and OpenWorks Engineering expand C2 interoperability

24 March 2026

Counter-unmanned systems (C-UxS) solutions provider, DroneShield, today announced interoperability between DroneSentry-C2 command-and-control software and optical sensing technologies from OpenWorks Engineering.

Fiona Walters takes over as Serco’s UK & Europe CEO

Defence Security Space

Fiona Walters takes over as Serco’s UK & Europe CEO

24 March 2026

Fiona Walters has taken up her role as CEO of the UK & Europe division of Serco, having joined Serco in September 2025 from G4S, where she was Regional CEO for the UK & Ireland, leading a team of more than 30,000 people.

GKN Aerospace delivers upgraded RM12 engine to Swedish Armed Forces

Defence

GKN Aerospace delivers upgraded RM12 engine to Swedish Armed Forces

24 March 2026

GKN Aerospace has successfully delivered the first upgraded RM12 engine to the Swedish Armed Forces, marking a significant milestone in the ongoing RM12EP (Enhanced Performance) programme.

Advertisement
PTC rectangle
FNX Ventures invests in Sentinel Photonics

Defence

FNX Ventures invests in Sentinel Photonics

24 March 2026

Sentinel Photonics, a UK defence technology company specialising in laser detection, prevention and intelligence, has secured investment from European venture capital firm, FNX Ventures.

Spectra launches GENSS production version

Defence Space Events

Spectra launches GENSS production version

23 March 2026

Spectra Group (UK) Ltd, specialists in delivering secure, reliable and resilient beyond line-of-sight communications for operations in denied and contested environments, has formally launched the production version of GENSS at the Satellite Show.

Advertisement
ODU RT
Advertisement
Gulfstream banner