Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide

Aerospace

Gatwick refines Northern Runway plan

Since submitting its Northern Runway plans to the Planning Inspectorate, London Gatwick has refined its proposal and identified three changes to reduce its environmental impact even further, while also providing additional design flexibility.

Image courtesy Gatwick Airport / VINCI Airports

Before submitting these changes to the Planning Inspectorate, the airport will next week (13th December 2023) open a consultation so that the public, landowners and other stakeholders can give their views on the proposed changes.

These views will be taken into account before the airport submits a request to amend its DCO application to the Planning Inspectorate. It will be for the Planning Inspectorate to decide if the changes can be made to the application and included in the examination.

Advertisement
ODU RT

The consultation will close at 11:59pm on 21st January 2024.

The airport proposes making the three separate changes to the Project below. Further detailed information on these changes and information on how to submit responses to the consultation will be available on the London Gatwick website once the consultation is live.

  • Project Change 1: Increase to the design parameters for the North Terminal International Departure Lounge proposed southern extension
  • Project Change 2: Reduction in the height and change in the purpose of the replacement Central Area Recycling Enclosure (CARE) facility
  • Project Change 3: Revision to the Surface Water Treatment Works system

London Gatwick’s application to bring its Northern Runway into routine use, alongside its Main Runway, was accepted for examination by the Planning Inspectorate on 3rd August 2023.

Advertisement
Security & Policing Rectangle

The airport’s Northern Runway plan would create around 14,000 new jobs and inject £1 billion into the region’s economy every year from increased tourism, trade, supply-chain, and other business opportunities.

Tim Norwood, Chief Planning Officer, London Gatwick, said: “Our engagement with the public and stakeholders to date has been invaluable in helping us shape our Northern Runway plans. However, since the submission of our DCO application we have identified a number of small improvements we would like to make to our proposal. We are therefore asking for views on three discrete changes to our plans and would welcome any feedback people may want to make.”

 

 

Advertisement
ECS leaderboard banner
UK hydrogen airport trial sets out roadmap for further studies

Aerospace

UK hydrogen airport trial sets out roadmap for further studies

18 February 2026

A new report into the UK’s first airside trial of multiple hydrogen-powered ground support equipment (GSE) has confirmed that hydrogen can be safely and effectively integrated into airport ground operations, whilst setting out a series of essential next steps needed to accelerate hydrogen adoption and decarbonisation across the aviation sector.

Kent collaborates on Pre-FEED study for Eq.flight SAF demo plant

Aerospace

Kent collaborates on Pre-FEED study for Eq.flight SAF demo plant

18 February 2026

Integrated energy services partner, Kent, has collaborated with Equilibrion during a successful bid for funding from the UK Department for Transport’s Advanced Fuels Fund (AFF) and with that funding for Equilibrion and its partners, Kent is delivering the Pre-Front-End Engineering Design (Pre-FEED) for Eq.flight, an advanced power-to-liquids ...

TEKEVER launches UAS Training School at West Wales Airport

Aerospace

TEKEVER launches UAS Training School at West Wales Airport

18 February 2026

Today, provider of AI-centred uncrewed aerial systems, TEKEVER, has announced the official opening of its new Training School at West Wales Airport.

UK

Aerospace

UK's January air traffic soars into 2026

17 February 2026

January’s UK air traffic increased by 1,725 flights in 2026 versus the previous year, equivalent to a 1% uptick in flights flying in UK airspace.

Advertisement
PTC rectangle
Responsive Engineering unveils apprentice-built Welding Academy

Aerospace

Responsive Engineering unveils apprentice-built Welding Academy

17 February 2026

Responsive Engineering, the daughter company of Pearson Engineering, marked National Apprenticeship Week with the unveiling of its new Welding Academy, a unique training space built almost entirely by its apprentices using repurposed and recycled materials.

UK pioneers 3D printing of aircraft parts using recycled titanium

Aerospace Defence

UK pioneers 3D printing of aircraft parts using recycled titanium

17 February 2026

QinetiQ, in partnership with Additive Manufacturing Solutions Limited (AMS Ltd.), has completed the maiden flight of an aircraft containing a 3D printed structural component, made from recycled titanium.

Advertisement
ODU RT
Advertisement
ECS leaderboard banner