Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Aerospace
  • /
  • GKN Aerospace and GE sign aero engines agreement

Aerospace

GKN Aerospace and GE sign aero engines agreement

GKN Aerospace and GE have deepened their long-term partnership on a series of advanced engines including the GEnx programme, the fastest-selling high-thrust engine.


 
Image copyright GE

The new agreement focuses on three key areas, namely new technology insertion, fan case production and assembly and repair of high volume, complex engines structures.

The ground-breaking technology insertion programmes on the GEnx will focus on alternative material solutions, providing a more sustainable manufacturing footprint for several products currently flying. GKN Aerospace will provide component design expertise as well as its latest technologies, to help drive the GEnx programme towards its targets on carbon emissions reduction targets and cost reduction. Upgraded components are expected to go through development, validation and insertion from 2024 to 2030.

Advertisement
Siemens rectangle

GKN Aerospace has also secured life-of-programme contracts under the new agreement. It will now deliver 100% of GEnx, CF6 and GE90 fan cases, as well as 50% of GE9X fan case assembly for the duration of the programme.

The final element of the enhanced partnership sees GKN Aerospace join GE Aerospace’s repair network, supporting the GEnx with specialised repair content. GKN Aerospace will deploy its expertise in structural design-and-make of advanced fabrications to repair high volume, complex structures across its global repair network.

Joakim Andersson, President of GKN Aerospace’s Engines business, said: “GE Aerospace and GKN Aerospace have had a strong relationship for more than 40 years and we are extremely proud of our partnership.

"Over the years we have grown our responsibility across all major GE engines and today we are in long-term partnerships with design authority for multiple programmes. This major new agreement is the next step. It ensures that we will continue to jointly develop the right technologies and solutions for world-leading engines such as the GEnx and CF6 for today and the future.”

Kathy MacKenzie, Vice President, GE Aerospace commercial programs stated: “We are excited to expand our strategic relationship with GKN. Their design expertise and production capability will enable us to continue to meet strong demand for the GEnx engine and their component repair development will offer a cost-saving choice for our services customers.”

 

Advertisement
Leonardo

 

 

 

Advertisement
Amentum banner Amentum banner
Intelliconnect strengthens management team

Aerospace Defence

Intelliconnect strengthens management team

17 September 2025

RF and Cryogenic interconnect solutions specialist Intelliconnect (Europe), has strengthened its senior leadership team with the appointment of Yiannis Metallinos as Managing Director and Gary Langridge as Engineering Manager.

Getac launches UX10 and UX10-IP rugged tablets

Aerospace Defence Security

Getac launches UX10 and UX10-IP rugged tablets

17 September 2025

Getac has announced the launch of its next generation UX10 and UX10-IP fully rugged tablets.

Smith Myers to supply ARTEMIS Systems to Airbus Helicopters

Aerospace Defence

Smith Myers to supply ARTEMIS Systems to Airbus Helicopters

16 September 2025

Smith Myers has secured a major contract with Airbus Helicopters, under the framework of which ARTEMIS Mobile Phone Detection and Location Systems (MPDLS) will be factory-fitted and offered as a retrofit option across Airbus Helicopters' fleet of aircraft.

Britten-Norman Islander production reaches key milestone

Aerospace

Britten-Norman Islander production reaches key milestone

16 September 2025

Britten-Norman, manufacturer of the Islander aircraft, has reached a major milestone in its programme to bring full aircraft production to its Bembridge facility on the Isle of Wight, UK.

Advertisement
Siemens rectangle
TEKEVER reveals its largest UK site todate

Aerospace Defence

TEKEVER reveals its largest UK site todate

15 September 2025

TEKEVER has announced a new manufacturing facility in The Spectrum Building, a historic, Grade II-listed architectural icon designed by Sir Norman Foster, completed in 1982 and featured in James Bond film 'A View to a Kill' in 1984.

CBI offers support for Stansted’s growth plans

Aerospace

CBI offers support for Stansted’s growth plans

15 September 2025

Members of the Confederation of British Industry (CBI) visited London Stansted to see first-hand the airport’s role in driving regional economic growth and to offer their support for its plans to raise its passenger cap from 43 to 51 million a year, without increasing the number of flights beyond current permissions.

Advertisement
ODU RT