Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Defence
  • /
  • Oxley awarded RBSL contract to provide LEDs for British Army’s Challenger 3 MBT

Defence

Oxley awarded RBSL contract to provide LEDs for British Army’s Challenger 3 MBT

Oxley Group has been awarded the LED lighting contract for the British Army’s upgraded Challenger 3 Main Battle Tank (MBT) by Rheinmetall BAE Systems Land (RBSL), worth £1.39 million.

Image courtesy Oxley

Oxley Group will be providing internal cabin lighting, breach lighting and task lighting for the programme, with manufacturing commencing in 2025. This contract follows Oxley’s recent success in securing the contract for the LED lighting on the UK MOD’s Mechanised Infantry Vehicle (MIV) programme, ensuring commonality for the internal lighting across both platforms.

Advertisement
ODU RT

Full design and manufacture of the lighting will be undertaken at the Oxley Ulverston site in Cumbria. The SME employs a skilled team of 150 engineers, production technicians and support staff at the site. Securing this contract will support further growth and protect key manufacturing skills in the UK, including the 14 apprentices currently receiving training within the organisation.

A total of 148 Challenger 2 Main Battle Tanks will be upgraded by RBSL. The programme will make significant enhancements to the vehicle and provide the British Army with a world-class capability, made in the UK.

The upgraded vehicle, to be called Challenger 3, will be a network-enabled, digital Main Battle Tank with state-of-the-art lethality, upgraded survivability, plus world-class surveillance and target acquisition capabilities.

Under this latest contract award, the tanks will be equipped with the ’best in class’ LED lighting. Oxley lighting solutions offer high-build quality and high performance, as well as meeting the most stringent EMC and power standards. Oxley has many decades’ experience in manufacturing LED lighting with excellent optical performance and advanced technical characteristics, specifically designed for military vehicle applications.

Advertisement
ODU RT

Darren Cavan, Oxley Group CEO said: “We’re delighted to be awarded this contract, this builds on the success we have achieved on the MIV Boxer vehicle and further cements our world leading position in the provision of high-performance lighting for military vehicles. This contract gives us long term stability, protecting jobs and enabling us to further invest in technology and process improvements. We look forward to working in
partnership with the RSBL team as this programme develops.”

Colin McClean, Managing Director of RBSL added: “This contract is the latest in a series of UK supplier contracts awarded by RBSL for Challenger 3, ensuring the programme benefits from the best of British engineering and manufacturing whilst also sustaining valuable skills across the country.

“We are very pleased to welcome Oxley Group to the Challenger team and we look forward to working with them as the programme progresses.”
 

Advertisement
General Atomics LB
Royal Navy extends Systematic MTF contract

Defence

Royal Navy extends Systematic MTF contract

12 May 2025

The UK’s Royal Navy (RN) has awarded Systematic a five-year extension for the ongoing support for leadership of the development of Message Text Formats (MTFs) and production of the NATO Message Catalogue (APP-11).

UK-US trade deal confirmed

Aerospace Defence

UK-US trade deal confirmed

9 May 2025

The UK Government confirmed yesterday - on the 80th anniversary of VE Day - that the UK is the first nation to secure a trade deal with the new US administration.

RTX

Defence

RTX's Raytheon completes first PhantomStrike flight test

9 May 2025

RTX's Raytheon has successfully completed the first flight test of its PhantomStrike radar on its Multi-Program Testbed aircraft.

DE&S awards Rolls-Royce Typhoon engine support contract

Defence

DE&S awards Rolls-Royce Typhoon engine support contract

9 May 2025

Defence Equipment & Support (DE&S) has awarded a contract to Rolls-Royce - worth £563 million - for the continued maintenance and repair of EJ200 engines for Royal Air Force (RAF) Typhoons.

Advertisement
DSEI 2025
UK issues MTC for RAF

Defence

UK issues MTC for RAF's Protector RG Mk1

9 May 2025

The UK’s Military Aviation Authority has issued a Military Type Certificate (MTC) to the Royal Air Force’s Protector RG Mk1 uncrewed aircraft - also designated the MQ-9B - certifying that it has passed a rigorous airworthiness assessment and verifying it is safe to operate without geographic restrictions, including over populous areas.

Airframe Designs creates full-scale 3D-printed torpedo mock-up

Defence

Airframe Designs creates full-scale 3D-printed torpedo mock-up

8 May 2025

Aerospace leader Airframe Designs has been working with a global prime defence contractor to create a full-scale 3D-printed mock-up of a torpedo-style weapon using polymer additive manufacturing.

Advertisement
DSEI 2025