Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Space
  • /
  • Viasat's second Arctic Satellite Broadband Mission satellite completes thermal vacuum test

Space

Viasat's second Arctic Satellite Broadband Mission satellite completes thermal vacuum test

Viasat's second satellite in the upcoming Arctic Satellite Broadband Mission has completed thermal vacuum testing at Northrop Grumman’s Dulles, Virginia, site, marking a significant milestone as the project looks to connect the Arctic region with high speed broadband in the second half of 2024.

Image courtesy Viasat

The mission, led by the Space Norway subsidiary Heosat, will see two satellites deployed in a highly elliptical orbit (HEO) in the world’s first HEO mission carrying a broadband commercial service payload. The two satellites – ASBM-1 and ASBM-2 – will host Viasat’s GX-10a and GX-10b Ka-band payloads, extending Viasat’s high-speed global network across the Arctic region.

Advertisement
Gulfstream RT

The spacecraft are designed to integrate as part of Viasat’s wider satellite fleet and extend the coverage of its Ka-band network beyond that available from geostationary satellites. The payloads will be Viasat’s first in non-geostationary orbit and will become a key element of its co-operative hybrid network. Once launched, these new payloads will increase Viasat’s fleet size to 20, with an additional eight under development.

The Arctic has rapidly growing connectivity needs to serve governments, shipping companies, commercial airlines and scientists. In October 2023, the UK Government’s Environmental Audit Committee called for a greater political focus on the region and further research into the potential for environmental and economic impacts of changing weather patterns. Alongside GX10a and b, the spacecraft will host payloads for the Norwegian Armed Forces and the US Space Force.

Mark Dickinson, Head of Space Systems, Viasat, said: “We have been talking with our customers, partners and shareholders about how the combination with Inmarsat has given us a new scale and scope to deliver new solutions to meet our customers’ requirements. This is an example of what that means in practice. The investment we’ve made in our network is creating the flexibility, coverage and interoperability to meaningfully connect the world wherever and whenever our customers need it – even if they happen to be standing on the North Pole.”

Space Norway Programme Director, Kjell-Ove Skare, said: “With both satellites through the thermal vacuum test we are really closing in on making this strategically important capability real. We have seen an unprecedented collaborative effort with Viasat, the US Space Force, our Norwegian Armed Forces and with Northrop Grumman and are all looking forward to providing the first dedicated broadband services to users in the real Arctic.”

The ASBM-1 and ASBM-2 spacecraft will now undergo their final testing and readiness activities. Once complete, they will be transferred to Vandenberg Space Force Base, California and launched together on a SpaceX Falcon 9 rocket in mid-2024. The company will share further details on the launch schedule once confirmed.

Advertisement
Gulfstream RT

 

 

 

Advertisement
Babcock LB
UK Moonlight team expands

Space Events

UK Moonlight team expands

18 July 2025

Viasat, SSTL and MDA Space have announced they are working together to develop designs and proposals for a lunar orbiting communications satellite system around the Moon, called Moonlight.

MDA Space UK to prime ESA and UKSA regenerative 5G D2D comms from LEO

Space

MDA Space UK to prime ESA and UKSA regenerative 5G D2D comms from LEO

16 July 2025

MDA Space Ltd today announced that it will prime SkyPhi, a new mission funded by the European Space Agency (ESA) and the UK Space Agency (UKSA) that will enable regenerative 5G direct-to-device (D2D) satellite communications from Low Earth Orbit (LEO).

University of Surrey launches Space Institute

Space

University of Surrey launches Space Institute

16 July 2025

With the UK's £19 billion space economy surging, government and industry urgently need faster research, innovation and skilled talent – yet more than half of space organisations report critical shortages, a challenge now being tackled by the newly launched Surrey Space Institute at the University of Surrey.

Pioneering programme to develop horizontal space launch

Space

Pioneering programme to develop horizontal space launch

15 July 2025

Ahead of the UK Space Conference (Manchester, 16th-17th July 2025), Frazer-Nash has announced it is leading a new research programme, known as INVICTUS, to develop a comprehensive concept design for a vehicle and its integrated systems, with the goal of building and flying a Mach 5-capable aircraft at the edge of space by early 2031.

Advertisement
Gulfstream RT
Celestia UK starts building world’s first Ka-band multi-beam gateway

Space Events

Celestia UK starts building world’s first Ka-band multi-beam gateway

15 July 2025

Celestia UK is announcing at the UK Space Conference 2025 (Manchester, 16th-17th July 2025) that it has commenced the preproduction stage of a new generation of ground station gateway.

Bright Ascension launches strategic plan with new leadership team

Space

Bright Ascension launches strategic plan with new leadership team

14 July 2025

Bright Ascension Ltd has announced the appointment of a new CEO and the launch of its five-year strategic plan.

Advertisement
ODU RT