Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Space
  • /
  • Virgin Galactic reaches manufacturing milestone

Space

Virgin Galactic reaches manufacturing milestone

Virgin Galactic announced today that it has mated the fuselage and cabin of its next spaceship to the completed wing assembly.


Copyright Virgin Galactic

In addition, the two tail booms have been mated to the spaceship’s rear feather flap assembly. The completion of these two milestones brings assembly of the next SpaceShipTwo, planned to enter service after VSS Unity, a major step forward. 
 
With these milestones, the part fabrication of the wing, fuselage, cabin, nose and feather flap primary structures is now complete for the second commercial spaceship.  In addition, the majority of systems integration for the wing is complete, as well as the build of the cabin crew station installation.

Advertisement
Tritax 300x250

 
SpaceShipTwo vehicles are assembled in a modular fashion, with the cabin, fuselage, wing and feather assemblies built in parallel. Employing Design For Manufacturability and Assembly (DFMA) techniques, this approach grants easier access for systems integration earlier in the build process, as well as an overall shorter assembly duration.
 
Virgin Galactic established operations in Mojave, through its development and manufacturing arm, The Spaceship Company, to build and assemble a fleet of spaceships and carrier aircraft for the Virgin Galactic operations in New Mexico. While VSS Unity continues to progress through its comprehensive ground and flight testing program, and is now preparing for its move to Spaceport America in New Mexico, the Mojave-based team has been diligently building two additional SpaceShipTwos.
 
Enrico Palermo, President of The Spaceship Company said: “Our passionate and talented team has made great progress on the next SpaceShipTwo.  Seeing VSS Unity adjacent to the assembly of the next vehicle as well as the cabin of our third spaceship makes it very clear that we are building a fleet of remarkable spaceplanes for commercial service.”
Advertisement
ODU RT

 
Before mating the two assemblies, the metrology team used laser trackers to capture precise measurements of the fuselage and cabin and the wing. These measurements confirmed that the assemblies would come together as they were designed to.
 
In parallel to this operation, the feather assembly is taking shape. The inboard skins have been bonded to the boom internal structures and then rotated vertical and mounted on the feather flap assembly. The feather flap assembly is responsible for moving the spaceship’s booms into the feathered position used for stable re-entry through Earth’s atmosphere.
 
“It is exciting to imagine these two vehicles operating shoulder-to-shoulder from Spaceport America in New Mexico,” said George Whitesides, CEO of Virgin Galactic and The Spaceship Company. “We have a strong block design which we believe we can replicate to build the remainder of the fleet, continuing our march toward commercial service.”

 

Advertisement
Cranfield University
Spaceflux awarded UK Government space surveillance and tracking contracts

Defence Security Space

Spaceflux awarded UK Government space surveillance and tracking contracts

20 November 2025

UK-based specialist in space domain awareness (SDA) and space intelligence, Spaceflux Ltd, has won all three major multimillion-pound, multiyear UK government contracts to provide advanced space surveillance and tracking (SST) data across multiple orbital regimes.

BAE Systems advances RH12 Storefront

Space

BAE Systems advances RH12 Storefront

20 November 2025

BAE Systems has added new capabilities to its next-generation, radiation-hardened 12 nanometer (nm) Storefront.

GMV UK strengthens space safety

Space

GMV UK strengthens space safety

19 November 2025

GMV UK has taken a decisive step forward in the field of space safety with the development and implementation of an advanced collision avoidance capability for Low Earth Orbit (LEO) satellite constellations.

SaxaVord strengthens ops with new appointments

Space

SaxaVord strengthens ops with new appointments

18 November 2025

SaxaVord Spaceport has bolstered its growing team with two new senior appointments in operations as it prepares for first launch, with Ian Palmer joining as Director of Operations and Nadine Armiger-Drake as Spaceport Operations Manager.

Advertisement
ODU RT
Airbus-built Sentinel-6B climate satellite launched

Space

Airbus-built Sentinel-6B climate satellite launched

17 November 2025

The Airbus-built Sentinel-6B satellite has successfully launched from Vandenberg Space Force Base in California.

KT-UK and RADX partner on solutions for UK and Europe

Aerospace Defence Security Space

KT-UK and RADX partner on solutions for UK and Europe

17 November 2025

Konrad-Technologies UK Ltd (KT-UK) and RADX Technologies, Inc. (RADX) have entered a new partnership under which KT-UK will integrate solutions across the UK and EU.

Advertisement
Tritax 300x250