Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Defence
  • /
  • BAE Systems awarded $197m US Navy contract for USS Wasp modernisation

Defence

BAE Systems awarded $197m US Navy contract for USS Wasp modernisation

BAE Systems has received a $197.4 million contract from the US Navy to drydock and perform maintenance and modernisation work aboard the amphibious assault ship USS Wasp (LHD 1).


    
Above: The amphibious assault ship USS Wasp (LHD 1) transits the Mediterranean Sea, 21st July 2016.
Courtesy BAE Systems / US Navy photo

This is the second time in four years that the company has performed significant work onboard the Wasp to sustain its warfighting capability.

Under the new contract, BAE Systems’ Norfolk shipyard will begin working aboard the 843-foot-long USS Wasp in February 2021, performing hull, tank and mechanical work. The contract includes options that, if exercised, would bring the cumulative value to $237.7 million.

Advertisement
ODU RT

During the company’s last maintenance availability aboard the Wasp, from December 2016 to May 2017, BAE Systems added modifications to support Joint Strike Fighter operations onboard.

“BAE Systems is very familiar with USS Wasp, performing substantial upgrade work onboard before its forward deployment to Japan three years ago,” said Mark Whitney, deputy general manager of BAE Systems Ship Repair and general manager of Norfolk Ship Repair. “Our team of skilled tradespeople and subcontractors look forward to executing another long sustainment period on Wasp, to ensure the ship retains its sharp warfighting capability.”

The USS Wasp is the lead ship of a class of U.S. Navy amphibious assault ships. It is the 10th Navy vessel to bear the name since 1775.

Advertisement
Leonardo animated rectangle

To prepare for drydocking the Wasp, BAE Systems sent its largest floating drydock in Norfolk to a Baltimore, Maryland, shipyard for five months of lifecycle maintenance. The drydock, called “Titan,” returned to Norfolk earlier this month. The lifecycle maintenance work performed on Titan drydock will enable the yard to service the largest Navy ships in the port of Norfolk for another 20 to 25 years. Titan is capable of lifting up to 52,500 long tons. The USS Wasp displaces about 40,500 long tons.

 

Advertisement
General Atomics LB
Avon Protection receives European order for FM50 respirators

Defence Security

Avon Protection receives European order for FM50 respirators

11 December 2025

Avon Protection has received a new European order for FM50 respirators and FM61EU filters via the NATO Support and Procurement Agency (NSPA) contract vehicle.

BAE Systems to modernise USS Forrest Sherman

Defence

BAE Systems to modernise USS Forrest Sherman

10 December 2025

BAE Systems has received a $123 million contract from the US Navy to modernise the Arleigh Burke-class guided-missile destroyer USS Forrest Sherman (DDG 98).

Rheinmetall to provide Trailblazer on UK

Defence

Rheinmetall to provide Trailblazer on UK's MLRS A2

10 December 2025

Rheinmetall UK have been awarded a contract by the NATO Support & Procurement Agency (NSPA) to provide Trailblazer Driver Vision and Local Situation Awareness System to the UK Ministry of Defence’s M270 A2 Multiple Launch Rocket System (MLRS) platform upgrade.

Babcock recruits record number of graduates and apprentices

Defence

Babcock recruits record number of graduates and apprentices

10 December 2025

Babcock has opened applications for its 2026 apprentice intake as it unveils the recruitment of a record number of graduates and apprentices across its UK business.

Advertisement
Leonardo animated rectangle
UK joins defence exports treaty with European allies

Defence

UK joins defence exports treaty with European allies

10 December 2025

The UK has joined a European defence export treaty alongside its NATO allies, making it easier for British defence businesses to benefit from closer cooperation on exports with European allies France, Germany and Spain.

HMS Formidable keel laid

Defence

HMS Formidable keel laid

10 December 2025

Another significant moment on the Type 31 (T31) programme was delivered by Babcock yesterday at its Rosyth facility in Scotland, with the keel laid for HMS Formidable.

Advertisement
ODU RT