Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Aerospace
  • /
  • Airbus updates suppliers on production plans

Aerospace

Airbus updates suppliers on production plans

Airbus continues to expect the commercial aircraft market to recover to pre-COVID levels between 2023 and 2025, led by the single-aisle segment and is providing suppliers with an update of its production plans, giving visibility in order to schedule necessary investments and secure long term capacity and production rate readiness, in line with the expected recovery.

Copyright Airbus

“The aviation sector is beginning to recover from the COVID-19 crisis”, said Guillaume Faury, Airbus CEO. “The message to our supplier community provides visibility to the entire industrial ecosystem to secure the necessary capabilities and be ready when market conditions call for it. In parallel, we are transforming our industrial system by optimising our aerostructures set-up and modernising our A320 Family production facilities. All these actions are set in motion to prepare our future.”

Advertisement
ODU RT

A320 Family: Airbus confirms an average A320 Family production rate of 45 aircraft per month in Q4 2021 and calls on suppliers to prepare for the future by securing a firm rate of 64 by Q2 2023. In anticipation of a continued recovering market, Airbus is also asking suppliers to enable a scenario of rate 70 by Q1 2024. Longer term, Airbus is investigating opportunities for rates as high as 75 by 2025.

A220 Family: Currently at around rate five aircraft per month from Mirabel and Mobile, the rate is confirmed to rise to around six in early 2022. Airbus is also envisaging a monthly production rate of 14 by the middle of the decade.

A350 Family: Currently at an average production rate of five per month, this is expected to  increase to six by autumn 2022.

A330 Family: Production remains at an average monthly production rate of two per month.

Airbus is protecting its ability to further adapt as the market evolves.

Advertisement
Security & Policing Rectangle

 

 

Advertisement
General Atomics LB
Britten-Norman appoints Richard Milne as COO

Aerospace

Britten-Norman appoints Richard Milne as COO

5 November 2025

British aircraft manufacturer, Britten-Norman, has appointed Richard Milne as its Chief Operating Officer (COO).

Enterprise Control Systems launches ECS Connect

Aerospace Defence Security

Enterprise Control Systems launches ECS Connect

5 November 2025

Radio frequency (RF) technology specialist Enterprise Control Systems (ECS), part of SPX Communication Technologies, today announced the launch of ECS Connect.

Tekever and Arkeus integrate Warden hyperspectral sensor

Aerospace Defence Security

Tekever and Arkeus integrate Warden hyperspectral sensor

5 November 2025

Tekever and Arkeus have successfully completed a joint integration and flight test campaign, proving the full compatibility and mission-readiness of Tekever’s AR3 EVO tactical unmanned aerial system and Arkeus’ Warden Hyperspectral Optical Radar (HSOR).

Wayland Additive to showcase NeuBeam tech at Formnext

Aerospace Defence Events

Wayland Additive to showcase NeuBeam tech at Formnext

4 November 2025

Wayland Additive, a specialist in eBeam metal Additive Manufacturing (AM) technologies, is returning to Formnext (taking place 18th–21st November 2025 in Frankfurt, Germany) where it will be showcasing its NeuBeam technology.

Advertisement
Security & Policing Rectangle
Tech challenge launched to counter drone threats in prisons

Aerospace Security

Tech challenge launched to counter drone threats in prisons

4 November 2025

A new innovation challenge aimed at combatting the growing threat of drones to prisons has been launched by the Ministry of Justice through His Majesty's Government Communications Centre Co-Creation.

ATI Programme funds first projects to address non-CO2 aircraft emissions

Aerospace

ATI Programme funds first projects to address non-CO2 aircraft emissions

4 November 2025

The Aerospace Technology Institute (ATI) today announced funding for the first three projects under its Non-CO2 Programme.

Advertisement
ODU RT