Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Aerospace
  • /
  • GKN Aerospace deliver C-27J nacelles to Leonardo

Aerospace Defence

GKN Aerospace deliver C-27J nacelles to Leonardo

GKN Aerospace has delivered the first two C-27J nacelles to Leonardo Aircraft since 2018, marking a significant milestone in the revitalisation of its supply chain and production capabilities.


 
Image courtesy GKN

This achievement highlights GKN Aerospace’s support of the C-27J platform and reaffirms its commitment to the long-term in-service support of the aircraft. The first nacelle was delivered in September, followed by the second nacelle in October, aligning with Leonardo’s milestone to commence test flights and certification before year-end.

Advertisement
ODU RT

The accomplishment reflects the successful engagement of over 40 suppliers, the re-establishment of complex composite and assembly manufacturing capabilities and the securing of business continuity for the C-27J nacelle over the next five years. The programme has seen GKN Aerospace collaborate closely with Leonardo, including participation in the inaugural joint supplier and end-user conference held in Turin.

Shawn Black, President Defence Airframe said: "This milestone illustrates GKN Defence’s unwavering dedication to our customers and the expertise of our Cowes team. I am incredibly proud of what we’ve achieved in this journey, demonstrating our commitment to delivering excellence in defence aerostructures."

The nacelle’s composite components are produced at GKN Aerospace’s Cowes site and integrated with a variety of parts sourced from the EU, UK and US, ranging from titanium machining to wiring systems. GKN Aerospace’s Fokker business manufactures the harnesses integral to the nacelle, exemplifying GKN Aerospace’s full-spectrum manufacturing capabilities.

Advertisement
Leonardo animated rectangle

Rupert Dix, SVP Defence Airframe - Europe said: "The team’s tremendous effort to deliver the first two Leonardo C-27J nacelles, for a product that was last manufactured in 2018, is a testament to the collaboration across our site, our supply chain and the entire team’s dedication to our customer commitments."

GKN Aerospace has been a design and manufacturing partner for the C-27J programme since its inception in the 1990s. This latest nacelle delivery underscores the strength and versatility of GKN Aerospace’s capabilities in complex aerostructures and its ongoing support of the global defence sector.

Advertisement
General Atomics LB
Gatwick appoints Mathieu Boutitie as Chief Technical Officer

Aerospace

Gatwick appoints Mathieu Boutitie as Chief Technical Officer

19 December 2025

London Gatwick has announced Mathieu Boutitie, currently Chief Technical Officer at Kansai Airports Group, as its new Chief Technical Officer, replacing Cedric Laurier who will rejoin VINCI Airports in Paris, with both appointments effective January 2026

Stansted gets green light to increase passenger limit

Aerospace

Stansted gets green light to increase passenger limit

17 December 2025

London Stansted has today secured planning approval from Uttlesford District Council to increase its annual passenger limit up to 51 million, unlocking the potential to deliver a wide range of consumer, economic and community benefits over the next 20 years.

Skyports completes move to Drone Operations HQ

Aerospace Space

Skyports completes move to Drone Operations HQ

17 December 2025

Skyports Drone Services (Skyports) has completed a move into its new flagship, purpose-built, Drone Operations Hub in Westcott Venture Park, equipping the company with a state-of-the-art centralised facility for its UK, European and global drone operations.

Midlands manufacturers launch VORS

Aerospace Defence

Midlands manufacturers launch VORS

17 December 2025

Three Midlands manufacturing and design specialists - outsourcing expert PP Control & Automation (PP C&A), electronics design and software developer ByteSnap Design and contract electronics manufacturer Kasdonare - have joined forces to launch VORS (Versatile Outsourcing in Resilient Systems).

Advertisement
Leonardo animated rectangle
SLG installs new solar array at Bridge of Weir

Aerospace

SLG installs new solar array at Bridge of Weir

17 December 2025

Scottish Leather Group (SLG) has switched on a new Solar PV array at its production facility in Bridge of Weir, Scotland.

Aviation Minister views engine inspection tech at GE Aerospace Filton

Aerospace Defence

Aviation Minister views engine inspection tech at GE Aerospace Filton

16 December 2025

Aviation Minister Keir Mather MP visited GE Aerospace’s Filton facility last week (Thursday 11th December) to see how UK-engineered artificial intelligence (AI) technologies are helping to transform aircraft engine inspection and reinforce Britain’s position as a global centre of advanced aviation services.

Advertisement
ODU RT
Advertisement
General Atomics LB