Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Aerospace
  • /
  • Supply chain challenges could cost airlines over $11bn in 2025

Aerospace

Supply chain challenges could cost airlines over $11bn in 2025

The International Air Transport Association (IATA) in collaboration with Oliver Wyman, has launched a joint study, Reviving the Commercial Aircraft Supply Chain.


 
Image by Anton Hirsman / copyright Shutterstock

The report addresses supply chain challenges in the aerospace industry and explores the root cause of these challenges, the impact on airlines, and initiatives to move the aviation industry forward. 

Challenges within the aerospace industry’s supply chain are delaying production of new aircraft and parts, resulting in airlines reevaluating their fleet plans and, in many cases, keeping older aircraft flying for extended amounts of time. The worldwide commercial backlog reached a historic high of more than 17,000 aircraft in 2024, significantly higher than the 2010 to 2019 backlog of around 13,000 aircraft per year.

Advertisement
ODU RT

The slow pace of production is estimated to cost the airline industry more than $11 billion in 2025, driven by four main factors:

  • Excess fuel costs (~$4.2 billion): Airlines are operating older, less fuel-efficient aircraft because new aircraft deliveries are delayed, leading to higher fuel costs.
  • Additional maintenance costs ($3.1 billion): The global fleet is aging, and older aircraft require more frequent and expensive maintenance.
  • Increased engine leasing costs ($2.6 billion): Airlines need to lease more engines since engines spend longer on the ground during maintenance. Aircraft lease rates have also risen by 20–30% since 2019.
  • Surplus inventory holding costs ($1.4 billion): Airlines are stocking more spare parts to mitigate unpredictable supply chain disruptions, increasing inventory costs.

In addition to the mounting costs, supply chain challenges inhibit airlines from deploying sufficient aircraft to meet growing passenger demand. In 2024, passenger demand rose 10.4%, exceeding the capacity expansion of 8.7% and pushing load factors to a record 83.5%. The trend in rising passenger demand continues into 2025. 

The current aerospace industry economic model, disruptions from geopolitical instability, raw material shortages and tight labor markets all contribute to the origin of the matter. With these underlying causes considered, the report outlines key initiatives for original equipment manufacturers (OEMs), lessors and suppliers supported by airlines to confront the supply-demand imbalance and build greater resilience. 

Willie Walsh, IATA’s Director General said: “Airlines depend on a reliable supply chain to operate and grow their fleets efficiently. Now we have unprecedented waits for aircraft, engines and parts and unpredictable delivery schedules. Together these have sent costs spiralling by at least $11 billion for this year and limited the ability of airlines to meet consumer demand. There is no simple solution to resolving this problem but there are several actions that could provide some relief. To start, opening the aftermarket would help by giving airlines greater choice and access to parts and services. In parallel, greater transparency on the state of the supply chain would give airlines the data they need to plan around blockages while helping OEMs to ease underlying bottlenecks.” 

Advertisement
Leonardo animated rectangle

There are actions for the aerospace industry to consider:

  • Open up aftermarket best practices by supporting Maintenance, Repair and Operations (MRO) to be less dependent on OEM-driven commercial licensing models, as well as facilitating access to alternative sourcing of materials and services.
  • Enhance supply chain visibility by creating clearer visibility across all supplier levels to spot risks early, reduce bottlenecks and inefficiencies, and use better data and tools to make the whole chain more resilient and reliable.
  • Unlock value from data by leveraging predictive maintenance insights, pooling spare parts, and creating shared maintenance data platforms to optimize inventory and reduce downtime.
  • Expand repair and parts capacity to accelerate repair approvals, support alternative parts and Used Serviceable Material (USM) solutions, and adopt advanced manufacturing to ease bottlenecks.

To enact any of these initiatives, the first and most critical step for commercial aerospace industry participants to take is to develop a strategic approach among all stakeholders in the supply chain. The multi-headed challenges facing the industry call for collaboration to progress in the goal of better meeting aircraft production and maintenance demand. 

“Today’s aircraft fleet is larger, more advanced, and more fuel efficient than ever before,” said Matthew Poitras, Partner in Oliver Wyman’s Transportation and Advanced Industrials practice. “However, supply chain challenges are impacting airlines and OEMs alike. We see an opportunity to catalyse an improvement in supply chain performance that will benefit everyone but this will require collective steps to reshape the structure of the aerospace industry and work together on transparency and talent.”

Download the report (pdf)

Advertisement
Babcock LB
ADS reports seven year high for aircraft deliveries

Aerospace

ADS reports seven year high for aircraft deliveries

5 December 2025

According to ADS, commercial aircraft manufacturers delivered 132 aircraft in October 2025 - increasing by two thirds (67%) compared to October 2024 - marking the highest number of aircraft deliveries for the month of October since 2018.

Britten-Norman BN2T-4S Islander approved by TCAA

Aerospace

Britten-Norman BN2T-4S Islander approved by TCAA

2 December 2025

UK aircraft manufacturer Britten-Norman has received Transport Canada Civil Aviation (TCCA) type certification for the BN2T-4S Islander, the Rolls-Royce Model 250–powered turboprop variant of the company’s iconic utility aircraft.

CAA confirms summer 2025 busiest ever for UK aviation

Aerospace

CAA confirms summer 2025 busiest ever for UK aviation

2 December 2025

The Civil Aviation Authority’s latest aviation trends report confirms that 2025 saw the busiest summer ever for UK aviation.

UK airlines minimise A320 maintenance disruption

Aerospace

UK airlines minimise A320 maintenance disruption

2 December 2025

The UK Civil Aviation Authority provided an update on precautionary maintenance action required for some of the global Airbus A320 fleet, following the publication of an Alert Operators Transmission (AOT) on 28th November calling for immediate precautionary action on a number of in-service A320 Family aircraft.

Advertisement
ODU RT
Anotec achieves JOSCAR accreditation

Aerospace Defence

Anotec achieves JOSCAR accreditation

2 December 2025

Advanced surface coating specialist Anotec has strengthened its compliance across aerospace and defence, by achieving JOSCAR accreditation.

IATA reports accelerating passenger and cargo demand growth in October

Aerospace

IATA reports accelerating passenger and cargo demand growth in October

1 December 2025

Data for October 2025 released by the International Air Transport Association (IATA), shows global passenger demand growth accelerated to 6.6%, whilst cargo demand set a new record, rising by 4.1%.

Advertisement
Leonardo animated rectangle